My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-163
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 4:07:59 PM
Creation date
9/30/2015 9:42:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2006
Control Number
2006-163
Agenda Item Number
11.I.3.
Entity Name
Hardesty & Hanover LLP - FDOT
Subject
Work Order No. HH-1-Wabasso Causeway East & West Fishing Piers
Supplemental fields
SmeadsoftID
5632
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Financial Project ID: 2506152-32-02 <br />requirements. Note any items that may generate future problems on a proposed <br />project. <br />Detemune the feasibility of construction equipment ingress, egress and placement at <br />the job site. For utility relocations, retaining walls and bridge construction, determine <br />if the work will require any temporary retaining walls and bridge construction, <br />determine if the work will require any temporary retaining structures for equipment <br />placement and if failure of a temporary structure would iannnrrl�e the cafe[, of the <br />general public. For existing bridges being widened, particular attention shall be given <br />to feasibility of placing construction equipment within the median are of dual bridges. <br />The Consultant shall ensure that all construction plans, as applicable, are prepared -in <br />accordance with the latest standards adopted by applicable AASHTO manuals, FDOT <br />Roadway & Traffic Design Standards, FDOT Standard Specifications, current <br />Department memorandums, FDOT Plans Preparation Manuals, FDOT Structures Design <br />Guidelines, FDOT Structures Detailing Manual, FDOT Flexible & Rigid Pavement <br />Design Manual, FDOT Drainage Manual, and shall be accurate, legible, complete in <br />design, and drawn to the appropriate scale. Provide written comment on the adequacy of <br />all design submittals of construction plans. <br />POST -DESIGN SERVICES: <br />The Consultant shall provide the Department with the services of a qualified team to <br />conduct the following tasks: <br />1. Review shop drawings for projects designed by his staff or other consultants for <br />conformance with the contract plans, the special provisions and FDOT Plans <br />Preparation Manual. <br />2. Review design computations made by the Contractor Specialty Engineer or other <br />Consultants. <br />3. Assist in resolving construction problems. <br />IV COMPUTER SERVICES <br />A. Computations must be based on computer programs used by in-house roadway design <br />staff (i.e., Lotus, Word Perfect, MS Word, Excel Geopak, Microstation, etc.). Any <br />deviation from this must be approved by the Department's project manager. This is <br />intended for files, which are to be archived with the rest of the project documents. <br />B. The Consultant shall submit electronically all submittals and final plans and Spec. <br />packages prepared for letting. <br />A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.