ATTACHMENT 1 TO WORK ORDER HH -1 PROFESSIONAL SERVICES <br />DESIGN OF REPAIRS TO <br />WABASSO CAUSEWAY EAST & WEST FISHING PIERS <br />SCOPE OF WORK: <br />BACKGROUND: <br />On 1-16-06 the FDOT's bridge inspection consultant inspect the Wabasso Causeway east and west <br />fishing piers. The subsequent report identified several significant deficiencies and failures, <br />consequently the FDOT recommended closing the East pier in it's entirety until it is replaced and <br />the west pier be repaired immediately to maintain it's service and possible closure until repairs are <br />accomplished. The scope of this project entails professional design services to provide <br />restoration/replacement of the piers. <br />SCOPE: <br />CONSULTANT will provide the following: <br />1. Inspect East & West Piers to locate all deficiencies <br />2. Contract Plans - 50% and Final Submission with cost estimate <br />3. (2) Plan Review Meetings <br />Contract Plans and associate Specifications as anticipated and provided by the <br />CONSULTANT will include the following drawings: <br />1. Key Sheet <br />2. General & Structural Notes and Table of Quantities <br />3. Plan & Elevation and Typical Section <br />4. Bulkhead Repairs/Sidewalk undermining <br />5. Pile and Pile Cap Repair Location Plan and Crack Repair Detail <br />6. Pile Cap Reconstruction <br />7. Beam Repair Location Plan & Repair Detail <br />8. New Beam Details <br />9. Deck Section Details <br />10. Deck Repair Location Plan and Repair Details <br />11. Railing and Lighting Details <br />As per the 1-16-06 FDOT inspection report, the CONSULTANT will include the following <br />repairs in the contract plans: <br />West Fishing Pier: <br />Top of Deck: <br />Patch all concrete spalls, seal all cracks wider than 1/32", clean and seal top of deck with a <br />penetrant sealer. <br />Replace lighting system. <br />Concrete Beams: <br />Clean and seal all cracks wider than 1/32". Remove all unsound concrete, restore exposed <br />prestressed cables, and apply a corrosion inhibitor, patch all spalls. <br />Replace Beam 10-1 <br />