Laserfiche WebLink
Pile Caps: <br />Remove all unsound concrete, patch all spalls, clean and seal concrete. Clean and seal all <br />cracks 1/32" wide. <br />Piles: <br />Clean seal all cracks 1/32" or wider. <br />Approach Sidewalk: <br />Repair undermining <br />Bulkhead: <br />Remove cracked bulkhead <br />East Fishing Pier: <br />Demolition: <br />Remove deck, T -beam superstructure, and salvage existing railing to reuse. <br />Top of Deck: <br />Replace Deck with new concrete deck, and curbs. Remount existing railing to new deck. <br />Beams: <br />Replace all Beams <br />Pile Caps: <br />Remove Pile caps, Reconstruct new Pile cap <br />Piles: <br />Sawcut piles underneath pile cap and reconstruct piles with pile cap reconstruction. <br />Seal cracks and repair spalls. <br />Bulkhead: <br />Repair spall on bulkhead cap on south side. <br />DELIVERABLES: <br />1. 50 percent preliminary design review submittal — provide one copy each of the <br />above drawings together with one copy of the outlined technical specifications. Also <br />provide quality control comments and opinion of probable construction cost with this <br />submittal. <br />2. 100 percent construction documents final submittal — provide one signed and sealed <br />copy of the above drawings and technical specifications compatible with EJCD 1996 <br />General Conditions and FDOT Standard Specifications for Road and Bridge <br />Construction latest edition also provide digital AutoCAD drawing files 2005 edition or <br />later with digital word document files of the technical specifications. <br />3. Conformed sets — After the project is bid but before the COUNTY awards the <br />construction contract, provide five signed and sealed copies of the conformed <br />contract drawings and five signed and sealed sets of the confirmed technical <br />specifications. Further any revisions to the above digital drawing and document files <br />shall be provided <br />END ATTACHMENT 1 <br />