My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-163
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 4:07:59 PM
Creation date
9/30/2015 9:42:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2006
Control Number
2006-163
Agenda Item Number
11.I.3.
Entity Name
Hardesty & Hanover LLP - FDOT
Subject
Work Order No. HH-1-Wabasso Causeway East & West Fishing Piers
Supplemental fields
SmeadsoftID
5632
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pile Caps: <br />Remove all unsound concrete, patch all spalls, clean and seal concrete. Clean and seal all <br />cracks 1/32" wide. <br />Piles: <br />Clean seal all cracks 1/32" or wider. <br />Approach Sidewalk: <br />Repair undermining <br />Bulkhead: <br />Remove cracked bulkhead <br />East Fishing Pier: <br />Demolition: <br />Remove deck, T -beam superstructure, and salvage existing railing to reuse. <br />Top of Deck: <br />Replace Deck with new concrete deck, and curbs. Remount existing railing to new deck. <br />Beams: <br />Replace all Beams <br />Pile Caps: <br />Remove Pile caps, Reconstruct new Pile cap <br />Piles: <br />Sawcut piles underneath pile cap and reconstruct piles with pile cap reconstruction. <br />Seal cracks and repair spalls. <br />Bulkhead: <br />Repair spall on bulkhead cap on south side. <br />DELIVERABLES: <br />1. 50 percent preliminary design review submittal — provide one copy each of the <br />above drawings together with one copy of the outlined technical specifications. Also <br />provide quality control comments and opinion of probable construction cost with this <br />submittal. <br />2. 100 percent construction documents final submittal — provide one signed and sealed <br />copy of the above drawings and technical specifications compatible with EJCD 1996 <br />General Conditions and FDOT Standard Specifications for Road and Bridge <br />Construction latest edition also provide digital AutoCAD drawing files 2005 edition or <br />later with digital word document files of the technical specifications. <br />3. Conformed sets — After the project is bid but before the COUNTY awards the <br />construction contract, provide five signed and sealed copies of the conformed <br />contract drawings and five signed and sealed sets of the confirmed technical <br />specifications. Further any revisions to the above digital drawing and document files <br />shall be provided <br />END ATTACHMENT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.