Laserfiche WebLink
EXHIBIT ` 1 ' <br /> SCOPE OF WORK <br /> WORK ORDER NO , 2 <br /> The project consist of designing approximately 20+ water main conflict crossings between the <br /> existing water mains and proposed gravity stormwater system proposed for the 66 "' Avenue, <br /> Phase H constriction project . The conflicts are anticipated to be located on : 66 "' Avenue ; 4"' <br /> Street ; 8 "' Street ; and turnouts located on 4"' Place , 4"' Lane , 5t" Street, 5 "' Place <br />, and 65th <br /> Avenue . In addition to the conflict crossings , several gravity stormwater crossings will be <br /> redesigned to prevent potential conflicts with existing water mains . <br /> The following describes our proposed scope of work and terms of agreement between Carter <br /> Associates , Inc . (CONSULTANT) and Indian River County Department of Utility Services <br /> ( COUNTY) : <br /> Task 1 - Design Survey : CONSULTANT will perforrn surveying services for the project site to <br /> include the following : <br /> 1 . The anticipated water main conflicts have previously been identified, were exposed and <br /> surveyed under a scope of services with IRC Public Works . However, since performance <br /> of those services , two additional cross drains on 66t" Avenue were requested by IRC <br /> Engineering staff. These present potential conflicts and will require exposure and <br /> location/elevation surveying . <br /> 2 . Based upon the current roadway design , all other design surveying has been completed . <br /> Task 2 - Coordination with Public Works Department : CONSULTANT will meet with <br /> Public Works staff to : 1 ) coordinate with county staff on an acceptable method of incorporating <br /> the new conflict plans into the roadway Bld/Constrrction plan set and 2) attend progress <br /> meetings with county staff as the Bid/Construction plan set is revised . <br /> Task 3 - Construction Plans and Specifications : CONSULTANT will prepare plan and profile <br /> drawings of each conflict crossing, detail sheets , and technical specifications for the proposed <br /> water main conflicts . <br /> Task 4 - Permitting : CONSULTANT intends to utilize the permitting exemption found in <br /> paragraph 62 - 555 . 520( 1 ) (c) 3 . of the Florida Administrative Code for relief from a Florida <br /> Department of Environmental Protection permit . Plans will be forwarded to the Department to <br /> obtain the exemption . CONSULTANT anticipates that no county Right- of-Way or Utility <br /> permits will be required for this project . <br /> Task 5- Construction Administration : CONSULTANT will attend pre-bid and pre- <br /> constriction meetings . CONSULTANT shall : act as liaison between the Contractor and Indian <br /> River County during construction of the water main conflicts ; review shop drawings and other <br /> Page 2 of 6 <br />