My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:17:58 PM
Creation date
10/1/2015 4:08:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021A
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contractor
Subject
Contract Documents and Specifications
Culvert Replacement
Area
6th Ave. SW North of 23rd. St. SW
Project Number
1136
Bid Number
2012033
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR may need to secure may include but not be limited to : <br /> 1 . Long -term and /or short-term dewatering permit as required by the St . Johns <br /> River Water Management District ( SJRWMD ) . Generally , only the short-term <br /> permit is required . Contact SJRWMD at ( 321 ) 9844940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> 2 . SJRWMD RDS - 50 Permit ( required ) ; <br /> 3 . The State of Florida Generic Permit for Stormwater Discharge From Large <br /> and Small Construction Activities ( required ) . Contact the Florida <br /> Department of Environmental Protection ( FDEP ) at ( 866 ) 336 - 6312 (toll <br /> free ) or ( 850 ) 245 - 7522 or www . dep . state . fl . us/water/stormwater/ npdes/ <br /> 4 . FDEP ' s Uncontaminated Groundwater Release Permit ( required if <br /> dewatering occurs ) . This permit requires water quality testing by a State <br /> certified laboratory . <br /> B . Provide copies of all permits to the OWNER and ENGINEER and comply with all <br /> conditions contained in all permits at no extra cost to the OWNER . If there is a conflict <br /> between any permit requirement and these Specifications , the more stringent <br /> specification or requirement shall govern . <br /> C . In addition to paying for all permit fees , CONTRACTOR shall also pay for all water <br /> quality sampling and laboratory tests required by any permit . <br /> 1 . 3 GENERAL <br /> A . Do not begin any other construction work until the pollution control and <br /> treatment system has been constructed in accordance with approved plans and <br /> permits and approved for use by the OWNER and applicable permitting <br /> authorities . <br /> B . From time to time , the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system , the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance , and it shall remain shut-down until the pollution <br /> control and treatment system is properly constructed or repaired , and complies with <br /> the approved pollution control and treatment system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as soon <br /> as practicable in portions of the site where construction activities have temporarily or <br /> permanently ceased , but in no case more than 7 days after the construction activity <br /> in that portion of the site has temporarily or permanently ceased . In addition to <br /> other temporary erosion control measures that may be implemented , application of <br /> polyacrylamide is required on all such disturbed areas within 7 days after the <br /> construction activity in that portion of the site has temporarily or permanently <br /> ceased , unless final landscaping has been installed . Polyacrylamide application <br /> shall be as specified herein . <br /> 01025-5 Technical Specifications <br /> F : \Public Works\ ENGINEERING DIVISION PROJECTS\ 1136-6th Ave SW Culvert Replacement N of 23rd St SW\Admim \Contract <br /> Documents\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.