Laserfiche WebLink
D . Inspect each pollution control system at least once per day and after each rainfall <br /> event . Clean and maintain each pollution control system as required by its <br /> manufacturer or the OWNER , until the system is no longer needed . If a water <br /> quality violation occurs , immediately cease all work contributing to the water quality <br /> violation and correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property , nor to <br /> the Work completed or in progress . The receiving point for water from construction <br /> operations shall be approved by the applicable owner , regulatory agency , and the <br /> ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1 . 4 SUBMITTALS <br /> A . Shop Drawings : Submit shop drawings of the proposed pollution control and treatment <br /> systems in accordance with Section 1340 . <br /> B . Stormwater Pollution Prevention Plan . <br /> 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR INSTALLATION AND MAINTENANCE <br /> A . State Certified Erosion Control Specialty Subcontractor is Required for Installation <br /> and Maintenance : Installation and maintenance of all erosion and stormwater <br /> pollution control devices , shall be by a State Certified erosion control subcontractor <br /> who specializes in the installation and maintenance of such devices . After <br /> installation , this specialty subcontractor shall maintain the erosion and stormwater <br /> pollution control devices until in the ENGINEER ' s sole opinion , the devices are no <br /> longer necessary ( such time not to extend past the date the OWNER formally <br /> accepts the project as complete ) . Before beginning construction , submit to Indian <br /> River County for review and approval , a Stormwater Pollution Prevention Plan <br /> ( SWPPP ) , prepared by the certified erosion control subcontractor . Construction <br /> shall not begin until the SWPPP has been approved by Indian River County . <br /> Submit the approved SWPPP to the ENGINEER before beginning construction . <br /> Include in the SWPPP , the " Contractor' s Affidavit Regarding Erosion Control and <br /> Treatment of Dewatering Water and Stormwater From the Construction Site <br /> ( located at the end of this Section ) . <br /> 1 . 6 " POLLUTION " AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br /> DEFINED <br /> A . With respect to this Section and as may be further defined in paragraphs 1 . 6 . 13 <br /> , <br /> 1 . 6 . C , and 1 . 6 . D , " pollution " is the presence in off- site waters of any substances <br /> , <br /> contaminants , or manmade or human - induced impairment of off- site waters or <br /> alteration of the chemical , physical , biological , or radiological integrity of off- site <br /> 01025-6 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1136-6th Ave SW—Culvert Replacement N of 23rd St SW\Admim \Contract <br /> Document s\Technical Specifications . doc <br />