My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:17:58 PM
Creation date
10/1/2015 4:08:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021A
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contractor
Subject
Contract Documents and Specifications
Culvert Replacement
Area
6th Ave. SW North of 23rd. St. SW
Project Number
1136
Bid Number
2012033
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATION <br /> The Contractor shall provide proper sized equipment for the installation of the box <br /> culverts and other structures . The overhead power lines will not be moved for this <br /> construction . The use of a crane will not be permitted near the power lines . <br /> QUESTIONS/ANSWERS <br /> QUESTION NO. 1 <br /> The plans say the elevation of the cofferdam will be determined by I . R . F . W . C . D . We need an <br /> idea of what that elevation will be since this will determine the amount of bypass pumping <br /> (FUEL) that we will use to keep the elevation maintained . <br /> ANSWER <br /> The two proposed cofferdams top elevation is to be at Elev . 15 . 00 NAVD . <br /> QUESTION NO . 2 <br /> Will the contractor need to keep a log of the onsite NTU water samples upstream and <br /> downstream of construction area and submit to the water management district on a daily basis ? <br /> ANSWER <br /> A Notice of Intent (NOI) will require a background test prior to construction . NTU water <br /> samples will be required once a week . There is a 29 NTU allowance beyond the background <br /> test . <br /> QUESTION NO . 3 <br /> Will any of the existing barricades and barrier walls be left on- site for this project? <br /> ANSWER <br /> The barricades and barrier will be removed from the project site when the Notice to Proceed is <br /> issued . The Contractor will be responsible to maintain the road closure and detouring during <br /> construction . <br /> Page 2 of 4 <br /> F: IPublicWorksIENGINEERINGDIVISION PROJECTSi1l36-6thAve SW Culvert Replacement Nof23rdStSWlAdmimlAddendumlADDENDUM <br /> NO 1. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.