Laserfiche WebLink
QUESTION NO . 4 <br /> Do the sod areas include the existing banks that will need to be pinned ? <br /> ANSWER <br /> Grassing on the canal banks may be too steep for sodding . Hydroseed in lieu of sod will be <br /> permitted on the canal banks . <br /> QUESTION NO . 5 <br /> Will there be any extra inspection fees for working on the weekend? <br /> ANSWER <br /> Regular working hours is between 7 : 00 a. m . to 5 : 00 p . m . Monday through Friday , excluding <br /> holidays . Any work beyond these hours (overtime) shall be requested in writing . All costs of <br /> inspection and testing performed during overtime work by the CONTRACTOR , which is <br /> allowed solely for the convenience of the CONTRACTOR, shall be borne by the <br /> CONTRACTOR, and a credit given to the owner to deduct the costs of all such inspection and <br /> testing from any payments otherwise due the CONTRACTOR . <br /> See SC - 6 . 02 of Section 600 — Supplementary Conditions to the General Conditions <br /> Page 3 of 4 <br /> F.• IPublic WorksIENGINEERING DIV7SIONPROJECTSIll36-6th Ave SW Culvert Replacement N of 23rd St SWIAdmimL4ddendumL4DDENDUM <br /> NO l. doc <br />