Laserfiche WebLink
3 . other property at the Site or adjacent 6 . 16 Emergencies <br /> thereto , including trees , shrubs , lawns , walks , <br /> pavements , roadways , structures , utilities , and A. In emergencies affecting the safety or protec - <br /> Underground Facilities not designated for tion of persons or the Work or property at the Site or <br /> removal , relocation , or replacement in the adjacent thereto , CONTRACTOR is obligated to act to <br /> course of construction . prevent threatened damage , injury , or loss . <br /> CONTRACTOR shall give ENGINEER prompt written <br /> B . CONTRACTOR shall comply with all applica - notice if CONTRACTOR believes that any significant <br /> ble Laws and Regulations relating to the safety of changes in the Work or variations from the Contract <br /> persons or property, or to the protection of persons or Documents have been caused thereby or are required <br /> property from damage , injury, or loss ; and shall erect as a result thereof. If ENGINEER determines that <br /> a <br /> and maintain all necessary safeguards for such safety change in the Contract Documents is required be- <br /> and protection . CONTRACTOR shall notify owners of cause of the action taken by CONTRACTOR in <br /> adjacent property and of Underground Facilities and response to such an emergency, a Work Change <br /> other utility owners when prosecution of the Work may Directive or Change Order will be issued . <br /> affect them , and shall cooperate with them in the <br /> protection , removal , relocation , and replacement of 6 . 17 Shop Drawings and Samples <br /> their property. All damage , injury , or loss to any <br /> property referred to in paragraph 6 . 13 .A . 2 or 6 . 13 . A . 3 A . CONTRACTOR shall submit Shop Drawings <br /> caused , directly or indirectly, in whole or in part , by to ENGINEER for review and approval in <br /> accordance <br /> CONTRACTOR , any Subcontractor , Supplier , or any with the acceptable schedule of Shop Drawings and <br /> other individual or entity directly or indirectly employed Sample submittals . All submittals will be identified as <br /> by any of them to perform any of the Work , or anyone ENGINEER may require and in the number of copies <br /> for whose acts any of them may be liable , shall be specified in the General Requirements . The data <br /> remedied by CONTRACTOR (except damage or loss shown on the Shop Drawings will be complete with <br /> attributable to the fault of Drawings or Specifications respect to quantities , dimensions , specified perfor <br /> - - - - <br /> or to the acts or omissions of OWNER or ENGINEER mance and design criteria , materials , and similar data <br /> or ENGINEER's Consultant, or anyone employed by to show ENGINEER the services , materials , and <br /> any of them , or anyone for whose acts any of them equipment CONTRACTOR proposes to provide and <br /> may be liable , and not attributable , directly or to enable ENGINEER to review the information for the <br /> indirectly, in whole or in part , to the fault or negligence limited purposes required by paragraph 6 . 17 . E . <br /> of CONTRACTOR or any Subcontractor, Supplier , or <br /> other individual or entity directly or indirectly employed B . CONTRACTOR shall also submit Samples to <br /> by any of them ) . CONTRACTOR's duties and ENGINEER for review and approval in accordance <br /> responsibilities for safety and for protection of the with the acceptable schedule of Shop Drawings <br /> and <br /> Work shall continue until such time as all the Work is Sample submittals . Each Sampie will be identified <br /> completed and ENGINEER has issued a notice to clearly as to material , Supplier, pertinent data such as <br /> OWNER and CONTRACTOR in accordance with catalog numbers , and the use for which intended and <br /> paragraph 14 . 07 . 13 that the Work is acceptable otherwise as ENGINEER may require to enable ENGk <br /> ( except as otherwise expressly provided in connection NEER to review the submittal for the limited purposes <br /> with Substantial Completion ) . required by paragraph 6 . 17 . E . The numbers of each <br /> Sample to be submitted will be as specified in the <br /> 6 . 14 Safety Representative Specifications . <br /> A. CONTRACTOR shall designate a qualified C . Where a Shop Drawing or Sample is required <br /> and experienced safety representative at the Site by the Contract Documents or the schedule of Shop <br /> whose duties and responsibilities shall be the Drawings and Sample submittals acceptable to ENGI - <br /> prevention of accidents and the maintaining and NEER as required by paragraph 2 . 07 , any related <br /> supervising of safety precautions and programs . Work performed prior to ENGINEER's review and <br /> approval of the pertinent submittal will be at the sole <br /> 6 . 15 Hazard Communication Programs expense and responsibility of CONTRACTOR . <br /> A. CONTRACTOR shall be responsible for D . Submittal Procedures <br /> coordinating any exchange of material safety data <br /> sheets or other hazard communication information 1 . Before submitting each Shop <br /> required to be made available to or exchanged be- Drawing or Sample , CONTRACTOR shall have <br /> tween or among employers at the Site in accordance determined and verified : <br /> with Laws or Regulations . <br /> a . all field measurements , quantities , <br /> dimensions , specified performance criteria , <br /> 00700 - General Conditions REV 04-07 . doc <br /> 00700 - 23 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1136-6th Ave SW—Culvert Replacement N of 23rd St SW\Admim\Contract Documents\00700 - General Conditions <br />REV 04-07 .doc <br />