3 . other property at the Site or adjacent 6 . 16 Emergencies
<br /> thereto , including trees , shrubs , lawns , walks ,
<br /> pavements , roadways , structures , utilities , and A. In emergencies affecting the safety or protec -
<br /> Underground Facilities not designated for tion of persons or the Work or property at the Site or
<br /> removal , relocation , or replacement in the adjacent thereto , CONTRACTOR is obligated to act to
<br /> course of construction . prevent threatened damage , injury , or loss .
<br /> CONTRACTOR shall give ENGINEER prompt written
<br /> B . CONTRACTOR shall comply with all applica - notice if CONTRACTOR believes that any significant
<br /> ble Laws and Regulations relating to the safety of changes in the Work or variations from the Contract
<br /> persons or property, or to the protection of persons or Documents have been caused thereby or are required
<br /> property from damage , injury, or loss ; and shall erect as a result thereof. If ENGINEER determines that
<br /> a
<br /> and maintain all necessary safeguards for such safety change in the Contract Documents is required be-
<br /> and protection . CONTRACTOR shall notify owners of cause of the action taken by CONTRACTOR in
<br /> adjacent property and of Underground Facilities and response to such an emergency, a Work Change
<br /> other utility owners when prosecution of the Work may Directive or Change Order will be issued .
<br /> affect them , and shall cooperate with them in the
<br /> protection , removal , relocation , and replacement of 6 . 17 Shop Drawings and Samples
<br /> their property. All damage , injury , or loss to any
<br /> property referred to in paragraph 6 . 13 .A . 2 or 6 . 13 . A . 3 A . CONTRACTOR shall submit Shop Drawings
<br /> caused , directly or indirectly, in whole or in part , by to ENGINEER for review and approval in
<br /> accordance
<br /> CONTRACTOR , any Subcontractor , Supplier , or any with the acceptable schedule of Shop Drawings and
<br /> other individual or entity directly or indirectly employed Sample submittals . All submittals will be identified as
<br /> by any of them to perform any of the Work , or anyone ENGINEER may require and in the number of copies
<br /> for whose acts any of them may be liable , shall be specified in the General Requirements . The data
<br /> remedied by CONTRACTOR (except damage or loss shown on the Shop Drawings will be complete with
<br /> attributable to the fault of Drawings or Specifications respect to quantities , dimensions , specified perfor
<br /> - - - -
<br /> or to the acts or omissions of OWNER or ENGINEER mance and design criteria , materials , and similar data
<br /> or ENGINEER's Consultant, or anyone employed by to show ENGINEER the services , materials , and
<br /> any of them , or anyone for whose acts any of them equipment CONTRACTOR proposes to provide and
<br /> may be liable , and not attributable , directly or to enable ENGINEER to review the information for the
<br /> indirectly, in whole or in part , to the fault or negligence limited purposes required by paragraph 6 . 17 . E .
<br /> of CONTRACTOR or any Subcontractor, Supplier , or
<br /> other individual or entity directly or indirectly employed B . CONTRACTOR shall also submit Samples to
<br /> by any of them ) . CONTRACTOR's duties and ENGINEER for review and approval in accordance
<br /> responsibilities for safety and for protection of the with the acceptable schedule of Shop Drawings
<br /> and
<br /> Work shall continue until such time as all the Work is Sample submittals . Each Sampie will be identified
<br /> completed and ENGINEER has issued a notice to clearly as to material , Supplier, pertinent data such as
<br /> OWNER and CONTRACTOR in accordance with catalog numbers , and the use for which intended and
<br /> paragraph 14 . 07 . 13 that the Work is acceptable otherwise as ENGINEER may require to enable ENGk
<br /> ( except as otherwise expressly provided in connection NEER to review the submittal for the limited purposes
<br /> with Substantial Completion ) . required by paragraph 6 . 17 . E . The numbers of each
<br /> Sample to be submitted will be as specified in the
<br /> 6 . 14 Safety Representative Specifications .
<br /> A. CONTRACTOR shall designate a qualified C . Where a Shop Drawing or Sample is required
<br /> and experienced safety representative at the Site by the Contract Documents or the schedule of Shop
<br /> whose duties and responsibilities shall be the Drawings and Sample submittals acceptable to ENGI -
<br /> prevention of accidents and the maintaining and NEER as required by paragraph 2 . 07 , any related
<br /> supervising of safety precautions and programs . Work performed prior to ENGINEER's review and
<br /> approval of the pertinent submittal will be at the sole
<br /> 6 . 15 Hazard Communication Programs expense and responsibility of CONTRACTOR .
<br /> A. CONTRACTOR shall be responsible for D . Submittal Procedures
<br /> coordinating any exchange of material safety data
<br /> sheets or other hazard communication information 1 . Before submitting each Shop
<br /> required to be made available to or exchanged be- Drawing or Sample , CONTRACTOR shall have
<br /> tween or among employers at the Site in accordance determined and verified :
<br /> with Laws or Regulations .
<br /> a . all field measurements , quantities ,
<br /> dimensions , specified performance criteria ,
<br /> 00700 - General Conditions REV 04-07 . doc
<br /> 00700 - 23
<br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1136-6th Ave SW—Culvert Replacement N of 23rd St SW\Admim\Contract Documents\00700 - General Conditions
<br />REV 04-07 .doc
<br />
|