My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:17:58 PM
Creation date
10/1/2015 4:08:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021A
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contractor
Subject
Contract Documents and Specifications
Culvert Replacement
Area
6th Ave. SW North of 23rd. St. SW
Project Number
1136
Bid Number
2012033
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installation requirements , materials , catalog technique , sequence , or procedure of con - <br /> numbers , and similar information with struction is specifically and expressly called for <br /> respect thereto ; by the Contract Documents ) or to safety <br /> precautions or programs incident thereto . The <br /> b . all materials with respect to intended review and approval of a separate item as such <br /> use , fabrication , shipping , handling , storage , will not indicate approval of the assembly in <br /> assembly, and installation pertaining to the which the item functions . <br /> performance of the Work ; <br /> 3 . ENGINEER's review and approval of <br /> c . all information relative to means , Shop Drawings or Samples shall not relieve <br /> methods , techniques , sequences , and CONTRACTOR from responsibility for any <br /> procedures of construction and safety variation from the requirements of the Contract <br /> precautions and programs incident thereto ; Documents unless CONTRACTOR has in <br /> and writing called ENGINEER's attention to each <br /> such variation at the time of each submittal as <br /> d . CONTRACTOR shall also have required by paragraph 6 . 17 . D . 3 and ENGk <br /> reviewed and coordinated each Shop NEER has given written approval of each such <br /> Drawing or Sample with other Shop variation by specific written notation thereof <br /> Drawings and Samples and with the incorporated in or accompanying the Shop <br /> requirements of the Work and the Contract Drawing or Sample approval ; nor will any <br /> Documents . approval by ENGINEER relieve CON - <br /> TRACTOR from responsibility for complying <br /> 2 . Each submittal shall bear a stamp or with the requirements of paragraph 6 . 17 . D . 1 , <br /> specific written indication that CONTRACTOR <br /> has satisfied CONTRACTOR's obligations F . Resubmittal Procedures <br /> - - - - --- under--the--Contract-Doc, espect -to - -- - - - - - ---- - - — <br /> CONTRACTOR's review and approval of that 1 . CONTRACTOR shall make correc- <br /> submittal , tions required by ENGINEER and shall return <br /> the required number of corrected copies of <br /> 3 . At the time of each submittal , CON - Shop Drawings and submit as required new <br /> TRACTOR shall give ENGINEER specific Samples for review and approval . CON - <br /> written notice of such variations , if any, that the TRACTOR shall direct specific attention in <br /> Shop Drawing or Sample submitted may have writing to revisions other than the corrections <br /> from the requirements of the Contract called for by ENGINEER on previous <br /> Documents , such notice to be in a written com - submittals . <br /> munication separate from the submittal ; and , in <br /> addition , shall cause a specific notation to be 6 . 18 Continuing the Work <br /> made on each Shop Drawing and Sample sub- <br /> mitted to ENGINEER for review and approval of A . CONTRACTOR shall carry on the Work and <br /> each such variation . adhere to the progress schedule during all disputes or <br /> disagreements with OWNER . No Work shall be <br /> E . ENGINEER 's Review delayed or postponed pending resolution of any <br /> disputes or disagreements , except as permitted by <br /> 1 . ENGINEER will timely review and paragraph 15 . 04 or as OWNER and CONTRACTOR <br /> approve Shop Drawings and Samples in may otherwise agree in writing , <br /> accordance with the schedule of Shop <br /> Drawings and Sample submittals acceptable to 6 . 19 CONTRACTOR 's General Warranty and <br /> ENGINEER . ENGINEER 's review and Guarantee <br /> approval will be only to determine if the items <br /> covered by the submittals will , after installation A. CONTRACTOR warrants and guarantees to <br /> or incorporation in the Work , conform to the OWNER , ENGINEER, and ENGINEER' s Consultants <br /> information given in the Contract Documents that all Work will be in accordance with the Contract <br /> and be compatible with the design concept of Documents and will not be defective , <br /> the completed Project as a functioning whole as CONTRACTOR's warranty and guarantee hereunder <br /> indicated by the Contract Documents . excludes defects or damage caused by: <br /> 2 . ENGINEER' s review and approval 1 . abuse , modification , or improper <br /> will not extend to means , methods , techniques , maintenance or operation by persons other <br /> sequences , or procedures of construction than CONTRACTOR , Subcontractors , <br /> (except where a particular means , method , <br /> 00700 - General Conditions REV 04-07 . doc <br /> 00700 - 24 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1 1 36-6th Ave SW_Culvert Replacement N of 23rd St SW\Admim\Contract Documents\00700 - General Conditions <br /> REV 04-07 .coc <br />
The URL can be used to link to this page
Your browser does not support the video tag.