My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-272
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 9:44:19 AM
Creation date
10/1/2015 2:33:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/02/2010
Control Number
2010-272
Agenda Item Number
8.H.
Entity Name
A.M. Engineering & Testing
Subject
Geotechnical Services Agreement
Work Order No.1 Roadway Improvements
Area
53rd Street Roadway Improvements
Project Number
0107
Supplemental fields
SmeadsoftID
9861
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> A , Mo ENGINEERING AND TESTINGS INC . <br /> 590 N.W. MERCANTILE PLACE <br /> PORT ST. LUCIE, FLORIDA 34986 <br /> (772) 924-3575 OFFICE - (772) 924-3580 FAX <br /> October 4 , 2010 <br /> Arjuna Weragoda, P .E . <br /> Indian River County <br /> 180127 1h Street, Building A <br /> Vero Beach, Florida 32960-3388 <br /> Re : 53rd Street Roadway Improvements, IRFWCD Lateral H Canal to Indian River Blvd. <br /> Indian River County, Florida <br /> Ladies and Gentlemen : <br /> A . M. Engineering and Testing, Inc . is pleased to submit the following estimate of the soil and <br /> concrete testing costs for the referenced project . The estimate is based on FDOT 2010 Standard <br /> Edition, our unit prices, our interpretation of the project specifications, and our experience on <br /> similar type projects . The actual testing costs could vary depending on site conditions, <br /> construction schedules, or engineer requirements . You would only be invoiced for work <br /> performed. <br /> PAVEMENT AREA SOILS <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Base Density (2 Lift) 80 20 15600 <br /> Subgrade Density 40 20 800 <br /> Curb Pad Density 26 20 520 <br /> Stabilized Subgrade Limerock 26 250 6, 500 <br /> Bearing Ratio (LBR) <br /> Sidewalk & Shoulder Density 32 20 640 <br /> Embankment Density 130 20 23600 <br /> Technician Time 56 45 25520 <br /> TOTAL $ 159180 <br /> UNDERGROUND UTILITIES STORM DRAINAGE BELOW PAVEMENT <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Storm Drain Backfill Density 11174 20 23 ,480 <br /> Technician Time 210 45 95450 <br /> TOTAL $329930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.