Laserfiche WebLink
/V <br /> A. M. ENGINEERING AND TESTING, INC. <br /> Testing Estimate for 53rd St. Roadway Improvements <br /> Indian River County, Florida <br /> UNDERGROUND UTILITIES WATER AND SEWER <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Water and Sewer utility Backfill 130 20 23600 <br /> Density <br /> Technician Time 30 45 19350 <br /> TOTAL $3 ,950 <br /> PROCTORS & OTHER LAB TESTING (Based on one Proctor test for each soil type .) <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Soil Proctor 8 75 600 <br /> Base Material Proctor 5 90 450 <br /> Soil Classification : <br /> Sieve Analysis for Soil (Full <br /> gradation including No. 200 sieve - 8 65 520 <br /> does not include hydrometer <br /> analysis) <br /> Atterberg Limits (Liquid limit and 8 95 760 <br /> plastic limit) <br /> Organic Content 8 30 240 <br /> Off-site stockpile Soil Classification : <br /> Sieve Analysis for Soil (Full <br /> gradation including No. 200 sieve - 4 65 260 <br /> does not include hydrometer <br /> analysis) <br /> Atterberg Limits (Liquid limit and 4 95 380 <br /> plastic limit) <br /> Organic Content 4 30 120 <br /> Technician Time 34 45 1 , 530 <br /> TOTAL $49860 <br /> CONCRETE TESTING (Based on one set of four 4" by 8 " cylinders per 50 cubic yards or <br /> fraction thereof for each class of concrete per day. ) <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Test Cylinders 20 70 13400 <br /> Technician Time 40 45 100 <br /> TOTAL $39200 <br /> 2 <br />