My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-272
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 9:44:19 AM
Creation date
10/1/2015 2:33:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/02/2010
Control Number
2010-272
Agenda Item Number
8.H.
Entity Name
A.M. Engineering & Testing
Subject
Geotechnical Services Agreement
Work Order No.1 Roadway Improvements
Area
53rd Street Roadway Improvements
Project Number
0107
Supplemental fields
SmeadsoftID
9861
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/V <br /> A. M. ENGINEERING AND TESTING, INC. <br /> Testing Estimate for 53rd St. Roadway Improvements <br /> Indian River County, Florida <br /> UNDERGROUND UTILITIES WATER AND SEWER <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Water and Sewer utility Backfill 130 20 23600 <br /> Density <br /> Technician Time 30 45 19350 <br /> TOTAL $3 ,950 <br /> PROCTORS & OTHER LAB TESTING (Based on one Proctor test for each soil type .) <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Soil Proctor 8 75 600 <br /> Base Material Proctor 5 90 450 <br /> Soil Classification : <br /> Sieve Analysis for Soil (Full <br /> gradation including No. 200 sieve - 8 65 520 <br /> does not include hydrometer <br /> analysis) <br /> Atterberg Limits (Liquid limit and 8 95 760 <br /> plastic limit) <br /> Organic Content 8 30 240 <br /> Off-site stockpile Soil Classification : <br /> Sieve Analysis for Soil (Full <br /> gradation including No. 200 sieve - 4 65 260 <br /> does not include hydrometer <br /> analysis) <br /> Atterberg Limits (Liquid limit and 4 95 380 <br /> plastic limit) <br /> Organic Content 4 30 120 <br /> Technician Time 34 45 1 , 530 <br /> TOTAL $49860 <br /> CONCRETE TESTING (Based on one set of four 4" by 8 " cylinders per 50 cubic yards or <br /> fraction thereof for each class of concrete per day. ) <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Test Cylinders 20 70 13400 <br /> Technician Time 40 45 100 <br /> TOTAL $39200 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.