SECTION 01050 <br />FIELD ENGINEERING AND LAYOUT <br />1.1 GENERAL <br />A. The CONTRACTOR will furnish all construction staking for the project. All staking <br />from control will be under the supervision of a Florida Registered Land Surveyor <br />B. Develop and make all detail surveys and measurements needed for construction <br />including but not limited to, slope stakes, batter boards, piling layouts and all other <br />working lines, elevations and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skilled <br />instrument man available whenever necessary for layout of the Work. <br />D Provide all material required for benchmarks, control points, batter boards, grade <br />stakes, and other items. <br />E Be solely responsible for all locations, dimensions and levels. No data other than <br />written orders of the ENGINEER shall justify departure from the dimensions and <br />levels required by the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments and benchmarks made or <br />established on the Work, and reestablish same, if disturbed. Rectify all Work <br />improperly installed because of not maintaining not protecting or removing without <br />authorization such established points, stakes, marks and monuments. <br />G When requested by the ENGINEER, provide such facilities and assistance as may <br />be necessary for the ENGINEER to check line and grade points placed by the <br />CONTRACTOR. Do no excavation or embankment work until all cross -sectioning <br />necessary for determining pay quantities has been completed and checked by the <br />ENGINEER <br />H. The cost of performingengineering and layout work described above shall be <br />included in the contract unit prices for the various items of work to which it is <br />incidental. No separate payment will be made for surveying or engineering. <br />1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br />A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br />accuracy of all survey and existing site information as indicated in the Contract <br />Documents. Immediately notify the ENGINEER upon discovery of any errors, <br />inaccuracies or omissions in the survey data. The commencing of any of the work <br />by the CONTRACTOR shall be held as the CONTRACTOR's acceptance that all <br />survey or existing site information is correct and accurate, without any reasonably <br />inferable errors, inaccuracies or omissions. <br />1050-1 01050 Field Engineering <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train Bldg\Admim\bid documents\Contract <br />Documents\01050 - Field Engineering.doc <br />