Laserfiche WebLink
ITEMIZED BID SCHEDULE - ADDENDUM #2 <br />INDIAN RIVER COUNTY PUBLIC SHOOTING RANGE - SKEET AND TRAP FACILITY IMPROVEMENTS (PHASE I) <br />PROJECT NO. 1213/BID NO 2014026 <br />BIDDER'S NAME: ACS- 3 c 5 erk,; u. -s nC- <br />LS = Lump Sum EA = Each CY = Cubic Yard SY = Square Yard AC = Acre TN = Tons <br />TOTAL BID AMOUNT INCLUDING FORCE ACCOUNT IN WORDS): l'X tin&Real forty 40(.. ya,� <br />- r•Qe_ ,Lnd,c). el evn eA,nJ `p9 / <br />� <br />{fir:„/� <br />BASE BID <br />__ <br />..dais f� <br />. <br />"� <br />.I <br />d..s�'a" <br />2` <br />- <br />em,.. o, <br />' - nar <br />Descrpho r ' <br />Quart... <br />'. F`iy� <br />SF w1i <br />, <br />. • <br />.. <br />°. <br />Un..:_Fr <br />�j <br />. us_.. <br />y Unrt <br />P I% L <br />ce_._ <br />j +0.moetnL s <br />; <br />101-1 <br />MOBILIZATION <br />1 <br />LS <br />iQ 000.° <br />IQ 000,x3 <br />104 <br />EROSION AND WATER POLLUTION PREVENTION CONTROL <br />1 <br />LS <br />-70Q 22 <br />5..700 0i <br />103 <br />RECORD DRAWINGS/AS-BUILT DRAWINGS <br />1 <br />LS <br />?06)2, /S. <br />7 Cooed= <br />108 <br />N.P.D.E.S. PERMITTING <br />1 <br />LS <br />),CI 0 0.. <br />t_Ca2°(2 <br />110-1 <br />CLEARING AND GRUBBING <br />6yt 5 °� <br />SO <br />5.3 <br />AC <br />- <br />3 3. 999 <br />EMBANKMENT <br />(COMPACTED <br />IN <br />PLACE) (CONTRACTOR <br />lak <br />120-6-1 <br />SUPPLIED) <br />36,950 <br />CY <br />g, <br />323 .431 <br />5= <br />EMBANKMENT <br />(COMPACTED <br />IN <br />PLACE) (COUNTY <br />SUPPLIED) <br />120-6-2 <br />(CONTRACTOR TO HAUL MATERIAL FROM FAIRGROUNDS TO <br />.3,500 <br />CY <br />7.21 <br />c °-2 <br />162-2 <br />PREPARED SOIL LAYER - TOPSOIL (6") SITE <br />25,961 <br />SY <br />i <br />, i- <br />5 f g <br />boC. <br />3 <br />?� <br />162-3 <br />PREPARED SOIL LAYER - TOPSOIL (6") BERMS <br />11,351 <br />SY <br />1, <br />i <br />i <br />a a sn <br />430-34-321 <br />ALUMINIZED CORRUGATED METAL PIPE (12") <br />58 <br />LF <br />119.92 <br />eaO•to �. <br />550-10 <br />HOG <br />WIRE <br />FENCE & GATE (FURNISH <br />AND INSTALL) <br />1,330 <br />LF <br />?S <br />/, <br />raiU�(jz 50 <br />570-1 <br />PERFORMANCE <br />MULCH, <br />FERTILIZER <br />TURF (SEED) <br />AND <br />WATERING) <br />(BAHIA) <br />(INCLUDES <br />TOP SOIL, <br />12,981 <br />SY <br />o c J 5 <br />7 659,72 <br />- <br />573-1 <br />PERFORMANCE <br />SOIL FERTILIZER <br />TURF <br />AND <br />(HYDROSEED) <br />WATERING) <br />(BAHIA) (INCLUDES: <br />TOP <br />11,351 <br />SY <br />q <br />,,/Q <br />��� <br />i Qai 5 _ <br />PERFORMANCE <br />TURF <br />(SOD) (BAHIA) (INCLUDES: <br />TOP SOIL <br />q0 <br />1.10575-1-1 <br />FERTILIZER AND WATERING) <br />147 <br />SY <br />i. --- <br />R�j�,---- <br />580 <br />RIFLE RANGE BAFFLES (REPAIR) <br />434 <br />LF <br />3 <br />(t 3gf)Vo <br />..O4 <br />580-326-4 <br />MULCH WOOD CHIPS FOR TRAILS <br />O4 <br />% <br />795 <br />CY/- <br />' oSJ <br />590 <br />12' HIGH X 12" WIDE MASONRY WALL <br />138 <br />LF <br />a 8 '7;47'53 <br />3) 1g 2. =- <br />800 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />1Q0°' <br />7 (/ <br />1 7, 000" <br />FORCE ACCOUNT <br />1 <br />LS <br />30000.00 <br />30 000.00 <br />SKEET AND TRAP FACILITY IMPROVEMENTS <br />(PHASE 1) <br />TOTAL <br />bile <br />311, 67 <br />LS = Lump Sum EA = Each CY = Cubic Yard SY = Square Yard AC = Acre TN = Tons <br />TOTAL BID AMOUNT INCLUDING FORCE ACCOUNT IN WORDS): l'X tin&Real forty 40(.. ya,� <br />- r•Qe_ ,Lnd,c). el evn eA,nJ `p9 / <br />