Laserfiche WebLink
ITEMIZED BID SCHEDULE - ADDENDUM #2 <br />INDIAN RIVER COUNTY PUBLIC SHOOTING RANGE SKEET AND TRAP FACILITY IMPROVEMENTS (PHASE I) <br />PROJECT NO. 1213/BID NO 2014026 <br />BIDDER'S NAME: .AS -Scan c- S rui u- S <br />Walt o. escripfion ^ "` <br />Al <br />EMBANKMENT (COMPACTED IN PLACE) (COUNTY SUPPLIED <br />ON PROJECT SITE)(IN LIEU OF 120-6-2 IN BASE BID) <br />3,500 <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF QUANTITIES) <br />AND THE ITEMIZED BID SCHEDULE, THE BID DOCUMENTS WILL GOVERN <br />F:W bbc Wala1ENGINEERJNG DIVISION PROJECTSt1213-IRC ShooSa RanaeSkeet & Tran Immovemna R Ihren a Train R Mtn.e"t.nu:A Ann .n.e e A .r...rr... rrr 7r %- nnncuro Iu 7J..:..:+.w <br />00310-4 <br />. ALTERNATE #2 - LIEU OF TOTAL BASE BID AND ALTERNATE #1 <br />' <br />Mtn <br />NO <br />,a. <br />Descriptions t t ; tea N. : , ° js r <br />Sa antitsj <br />Unite <br />MUliitIRtreifa <br />AmqufitAM <br />101-1 <br />MOBILIZATION <br />1 <br />LS <br />5, aoo! <br />5,0001e- <br />104 <br />EROSION AND <br />5,7'e <br />5,700, cam' <br />WATER POLLUTION PREVENTION CONTROL <br />1 <br />LS <br />103 <br />RECORD <br />c <br />5.000- <br />C,0006. <br />DRAWINGS/AS-BUILT DRAWINGS <br />1 <br />LS <br />,nO. <br />108 <br />N P D E S PERMITTING <br />1 <br />LS <br />I �Q• cS <br />1,00o. Ce <br />tb <br />110-1 <br />CLEARING AND GRUBBING <br />0.4 <br />AC <br />„' s •?j <br />421 .S <br />G. <br />EMBANKMENT (COMPACTED IN PLACE) (COUNTY SUPPLIED)q <br />120-6-2 <br />(CONTRACTOR TO HAUL MATERIAL FROM FAIRGROUNDS TO <br />350 <br />CY <br />7 <br />�i 7/h,£o <br />162-2 <br />PREPARED SOIL LAYER ..b� TOPSOIL (6") SITE <br />1,600 <br />SY <br />. <br />• �9 <br />3/0- <br />430-34321 <br />ALUMINIZED CORRUGATED METAL PIPE (12") <br />38 <br />LF <br />55 <br />a 9%Qc4 <br />550-10 <br />HOG WIRE FENCE & GATE <br />(FURNISH AND INSTALL) <br />150 <br />LF <br />)4, -15 <br />I %2-- p <br />573-1 <br />PERFORMANCE TURF (HYDROSEED) <br />SOIL FERTILIZER AND WATERING) <br />(BAHIA) (INCLUDES: TOP <br />1,600 <br />SY- <br />/ , 9 <br />q0? <br />/ IN 0 <br />- <br />580 <br />RIFLE RANGE BAFFLES (REPAIR) <br />434 <br />LF <br />3 <br />.� <br />p� eg <br />�>: ��D.o— <br />9.3 o <br />3, C/ <br />- <br />580-326-4 <br />MULCH WOOD CHIPS FOR TRAILS <br />100 <br />CY <br />_ <br />DQ© <br />590 <br />12' HIGH X 12" WIDE MASONRY WALL <br />39, 1 <br />138 <br />LF <br />,99.11. <br />800 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />3 0a l--- <br />3, 00 0. <br />FORCE ACCOUNT <br />1 <br />LS I 10,000.00 <br />10,000 00 <br />SKEET AND TRAP FACILITY IMPROVEMENTS <br />(Alternate #2) <br />TOTAL <br />1 0011, <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF QUANTITIES) <br />AND THE ITEMIZED BID SCHEDULE, THE BID DOCUMENTS WILL GOVERN <br />F:W bbc Wala1ENGINEERJNG DIVISION PROJECTSt1213-IRC ShooSa RanaeSkeet & Tran Immovemna R Ihren a Train R Mtn.e"t.nu:A Ann .n.e e A .r...rr... rrr 7r %- nnncuro Iu 7J..:..:+.w <br />00310-4 <br />