Laserfiche WebLink
QUESTION NO. 10 <br />How in depth does the list of suppliers need to be? <br />ANSWER NO. 10 <br />The Bid form only requires subcontractors to be listed. During construction, pay applications will need <br />to list any suppliers that are not supplying release of liens. This list of suppliers should include any <br />supplier providing material that is becoming the property of Indian River County. <br />Additional Clarifications: <br />1. The quantities for EMBANKMENT (COMPACTED IN PLACE) (CONTRACTOR SUPPLIED) and MULCH <br />WOODCHIPS FOR TRAILS have been revised on the attached Itemized Bid Schedule. <br />2. An elevation of the proposed wall has been added to Sheet S-1 <br />3. Sheet C1.10 has been revised to show the proposed trail with a 10' width. <br />ATTACHMENTS: <br />1. Itemized Bid Schedule (Page 00310-3) <br />2. Revised Plans Sheets C1.10, C2.10, and 5-1 <br />Page 4of5 <br />?:\public \ `orkAENG FNEERING DIVISION PROJECTS'1=13-IRC Shtxiiin_ Range-Sk::et & Trap Iniprovecnnts I-lum_rs Train .Iraimthid <br />