My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO 5 <br />Can we burn clearing onsite or stock pile onsite somewhere, so we can save them hauling and dump fees. <br />ANSWER NO. 5 <br />The contractor is required to abide by all federal, state, and local regulations for the disposal of <br />material. The shooting range will remain in operation during construction so no burning will be <br />permitted. The contractor may stockpile debris in areas impacted by the proposed improvements, <br />however, the contractor is responsible for removal of debris from the site. <br />QUESTION NO. 6 <br />I did not see a spec for top soil, can we just use clean general fill? <br />ANSWER NO. 6 <br />Section 162 of the Technical Special Provisions covers topsoil. Clean general fill will not meet the <br />specifications for this material. <br />QUESTION NO. 7 <br />On page C1.14 it talks about the corrugated aluminum cap see photo. What photo? <br />ANSWER NO. 7 <br />Please disregard the "(SEE PHOTO)" notation. <br />QUESTION NO. 8 <br />On bid schedule item # 430-34-321 aluminized corrugated metal pipe 12" where is that going? <br />ANSWER NO. 8 <br />Sheet C1.14 clearly shows three (3) locations for the proposed 12" Corrugated Metal Pipe <br />QUESTION NO. 9 <br />What is the Force Account Pay Item? <br />ANSWER NO. 9 <br />The Force Account is a contingency pay item that provides additional funds in the project budget to <br />pay for quantity overruns. <br />Page 3of5 <br />F:1Ptiblic 4'orks\FNGINEERING D[V[SiON PROJEC:'TS\1213-IRC.' Shootin, Range -Skeet & Trap Improvemnis «; enters Train BickotActrairn\Iiid <br />rirnaimenistAtititmlitim 71t:\rtiieniinm No 1 ?_?il_Id ,t,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.