My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS / CORRECTIONS/QUESTIONS AND RESPONSES <br />The following questions (with responses) have been received by Indian River County: <br />QUESTION NO. 1 <br />Our site work subs have done take off on dirt needed on line item #120-6-1 on bid schedule. They are <br />coming you with 40,000cy to do the embankment. On addendum 1 you have 36,950cy. I think that is <br />low and it will cause a problem as the job moves forward. <br />ANSWER NO. 1 <br />Please note that the total quantity of embankment required to meet the proposed grades includes <br />items 120-6-1, 120-6-2, 162-2, 162-3. This total quantity accounts for more than the 40,000cy <br />calculated. <br />QUESTION NO. 2 <br />Would we be able to get a copy of the soils report? <br />ANSWER NO. 2 <br />Yes, the soils report is attached. <br />QUESTION NO. 3 <br />Is there any more information you can provide to clarify the "100% sterile" requirement for the mulch? <br />ANSWER NO. 3 <br />The 100% sterile mulch must be comprised of all plant material. It must be free from any trash or <br />inorganic debris. <br />QUESTION NO. 4 <br />How can we arrange a field visit to view the baffles that need to be repaired on the rifle range? <br />ANSWER NO. 4 <br />The Project Engineer, Etienne Bourgeois, P.E. 772.226.1931, ebourgeoisPircgov.com, should be <br />contacted directly to arrange for a site visit. The baffles can be viewed when the rifle range is "cold" <br />between shooting sessions. Any contractor that visits the site without the Engineer, must check-in at. <br />the Range Office before entering any wooded areas. <br />Page2ofS <br />F ,Public Works`•,ENGINEERING DIVISION PROJECTS 1\1213 -IRC Shooting Range -Skeet ez Trap Improvemnts & l'IUnt8i5 Train Bid�r`•.;\dmim\bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.