My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 5 <br />In order to construct/repair the baffles the rifle range will have to be shut down for a period of time. <br />How will this be arranged? <br />ANSWER NO. 5 <br />The contractor's proposed schedule will be utilized to arrange for the closure of the rifle range during <br />the baffle repairs. <br />QUESTION NO. 6 <br />The Division 2 Technical Specifications appear to include more work than is shown on the plans. <br />Could these specifications be for the original project? <br />ANSWER NO. 6 <br />The Division 2 Technical Specifications were used for the original construction and do include more <br />items than pertain to this project's scope of work. <br />QUESTION NO. 7 <br />Section 162 — Topsoil state the "volume of soil required is included in the excavation and embankment <br />quantities". The bid items 570-1, 573-1 and 575-1-1 (grassing items) state they include top soil, <br />fertilizer and watering. Could you please clarify if we need the include the top soil in the embankment <br />number or in the grassing number? <br />ANSWER NO. 7 <br />Top Soil is included as Pay Item 162-2 and 162-3. The quantities for embankment and grassing do not <br />include top soil. <br />QUESTION NO. 8 <br />It states 6" top soil for the site and berm but the plans shows 18" top soil on beiuis. Can you please get <br />clarified <br />ANSWER NO. 8 <br />Top Soil will be 6" thick on the berms. <br />Remainder of Page Intentionally Left Blank <br />Page 3of5 <br />F\Pub]ic Works\ENGINEERWG DIVISION PROJECTS ll2l3-IRC Shooting Range -Skeet & Trap lmprovenmts & Hunters Train Bldg`Admimlbid <br />
The URL can be used to link to this page
Your browser does not support the video tag.