Laserfiche WebLink
Additional Clarifications: <br />1. Alternate Bid #2 has been added to the bid schedule Alternate Bid #2 includes all work on the <br />construction plans except the work detailed on Sheet C1.20, which includes: <br />a. Proposed Hog Wire Fence, <br />b. Proposed Berms, <br />c. Proposed fill of Action Pistol Range Floor, <br />d. Proposed Stormwater Retention Areas, <br />e. Proposed Equipment Access and Culvert, and <br />f. Proposed Swale <br />2. Alternate Bid #2 includes a reduced mulch quantity. This mulch will only be placed within the low- <br />lying area closest to the parking lot of the western trail. <br />3. Alternate Bid #2 will include all work shown on sheet C1.30 <br />ATTACHMENTS: <br />1. Revised Section 00310 — Bid Form <br />2. Soils reports by KSM Engineering & Testing, Inc. dated 1998 and 2014 <br />Remainder of Page Intentionally Left Blank <br />0 <br />Page 4of5 <br />F:\Puhlic Works ENGINEERING DIVISION PROJECTS \1213 .IRC Shooting Range -Skeet & Trap lmprovcntnts & Hunters Train Bldg%Admimibid <br />