Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Cc)- <br />(hereinafter called CONTRACTOR). <br />• <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents The Work is generally described as follows: <br />This project involves all work necessary to construct improvement to the <br />Indian River County Shooting Range as depicted in the construction drawings prepared <br />by Donadio & Associates, Architects, P.A. The improvements include, but are not limited <br />to, clearing & grubbing, filling, mulching, and sodding, construction of earthen berms, a <br />concrete wall, and a raised/ dry pathway for the specific purpose of developing two new <br />action pistol ranges and a sporting clay shooting trail. Work on this project must comply <br />with all local, state, and federal regulating agency criteria and permits. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />P roject Name. Indian River County Public Shooting Range — Skeet and Trap <br />Facility Improvements (Phase I) <br />County Project Number: 1213 <br />B id Number: 2014026 <br />P roject Address: 10455 102nd Terrace, Sebastian, Florida <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in. the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 04-07 <br />00520 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train Bldg\Admim\bid documents\Contract <br />Documents\00520 - Agreement (Public Works) REV 04-07.doc <br />