Laserfiche WebLink
2. a preliminary schedule of Shop <br />Drawing and Sample submittals which will list <br />each required submittal and the times for sub- <br />mitting reviewing, and processing such <br />submittal; and <br />3. a preliminary schedule of values for <br />all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />Work into component parts in sufficient detail to <br />serve as the basis for progress payments <br />during performance of the Work. Such prices <br />will include an appropriate amount of overhead <br />and profit applicable to each item of Work. <br />the Site is started, CONTRACTOR and OWNE- - all <br />each deliver to the other, with copi-: o each <br />additional insured identified in ti - upplementary <br />Conditions, certificates of urance (and other <br />evidence of insurance ich either of them or any <br />additional insur- may reasonably request) which <br />CONTRA •' and OWNER respectively are <br />2.06 Preconstruction Conference <br />A. Within 20 days after the Contract Times tart <br />to run, but before any Work at the Site i rted, a <br />conference attended by CONTRACT ENGINEER, <br />and others as appropriate wil held to establish a <br />working understanding ong the parties as to the <br />Work and to disc a schedules referred to in para- <br />graph 2.05rocedures for handling Shop Drawings <br />and er submittals, processing Applications for <br />yment, and maintaining required records. <br />2.07 Initial Acceptance of Schedules <br />A. Unless otherwise provided in the Contract <br />Documents at least ten days before submission of the <br />first Application for Payment a conference attended by <br />CONTRACTOR, ENGINEER, and others as appropri- <br />ate will be held to review for acceptability to ENGI- <br />NEER as provided below the schedules submitted in <br />accordance with paragraph 2.05.B. CONTRACTOR <br />shall have an additional ten days to make corrections <br />and adjustments and to complete and resubmit the <br />schedules No progress payment shall be made to <br />CONTRACTOR until acceptable schedules are <br />submitted to ENGINEER. <br />1. The progress schedule will be <br />acceptable to ENGINEER if it provides an <br />orderly progression of the Work to completion <br />within any specified Milestones and the <br />Contract Times. Such acceptance will not <br />impose on ENGINEER responsibility for the <br />progress schedule, for sequencing, scheduling, <br />or progress of the Work nor interfere with or <br />relieve CONTRACTOR from CONTRACTOR's <br />full responsibility therefor. <br />2. CONTRACTOR's schedule of Shop <br />Drawing and Sample submittals will be <br />acceptable to ENGINEER if it provides a <br />workable arrangement for reviewing and <br />processing the required submittals. <br />3. CONTRACTOR's schedule of values <br />will be acceptable to ENGINEER as to form <br />and substance if it provides a reasonable <br />allocation of the Contract Price to component <br />parts of the Work. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, <br />AMENDING, REUSE <br />3.01 Intent <br />A. The Contract Documents are comple- <br />mentary; what is called for by one is as binding as if <br />called for by all <br />B. It is the intent of the Contract Documents to <br />describe a functionally complete Project (or part there- <br />of) to be constructed in accordance with the Contract <br />Documents. Any labor, documentation, services <br />materials, or equipment .that may reasonably be <br />inferred from the Contract Documents or from <br />prevailing custom or trade usage as being required to <br />produce the intended result will be provided whether <br />or not specifically called for at no additional cost to <br />OWNER. <br />C. Clarifications and interpretations of . the <br />Contract Documents shall be issued by ENGINEER <br />as provided in Article 9. <br />3.02 Reference Standards <br />A. Standards, Specifications, Codes, Laws, and <br />Regulations <br />1. Reference to standards, specifica- <br />tions manuals, or codes of any technical <br />society, organization, or association, or to Laws <br />or Regulations, whether such reference be <br />specific or by implication, shall mean the stan- <br />dard, specification, manual code, or Laws or <br />Regulations in effect at the time of opening of <br />Bids (or on the Effective Date of the Agreement <br />if there were no Bids),except as may be <br />otherwise specifically stated in the Contract <br />Documents. <br />2. No provision of any such standard, <br />specification, manual or code or any instruction <br />of a Supplier shall be effective to change the <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 9 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train Bldg\Admim\bid documents\Contract Documents100700 - <br />General Conditions REV 5-10.13.doc <br />