Laserfiche WebLink
duties or responsibilities of OWNER, <br />CONTRACTOR, or ENGINEER, or any of their <br />subcontractors, consultants agents, or employ- <br />ees from those set forth in the Contract <br />Documents, nor shall any such provision or <br />instruction be effective to assign to OWNER, <br />ENGINEER, or any of ENGINEER's <br />Consultants, agents, or employees any duty or <br />authority to supervise or direct the performance <br />of the Work or anyduty or authority to <br />u ndertake responsibility inconsistent with the <br />provisions of the Contract Documents. <br />3:03 Reporting and Resolving Discrepancies <br />A. Reporting Discrepancies <br />1. If, during the performance of the <br />Work, CONTRACTOR discovers any conflict, <br />e rror, ambiguity, or discrepancy within the Con- <br />tract Documents or between the Contract <br />Documents and any provision of any Law or <br />Regulation applicable to the performance of the <br />Work or of any standard specification, manual <br />or code, or of any instruction of any Supplier <br />CONTRACTOR shall report it to ENGINEER in <br />writing at once. CONTRACTOR shall not <br />proceed with the Work affected thereby (except <br />in an emergency as required by paragraph <br />6.16.A) until an amendment or supplement to <br />the Contract Documents has been issued by <br />o ne of the methods indicated in paragraph <br />3.04; provided, however, that CONTRACTOR <br />shall not be liable to OWNER or ENGINEER for <br />failure to report any such conflict, error, <br />ambiguity, or discrepancy unless CON- <br />TRACTOR knew or reasonably should have <br />known thereof. <br />B. Resolving Discrepancies <br />1. Except as may be otherwise <br />specifically stated in the Contract Documents, <br />the provisions of the Contract Documents shall <br />take precedence in resolving any conflict, error <br />ambiguity, or discrepancy between the <br />provisions of the Contract Documents and: <br />a. the provisions of any standard, <br />specification, manual, code, or instruction <br />(whether or not specifically incorporated by <br />reference in the Contract Documents); or <br />b the provisions of any Laws or <br />Regulations applicable to the performance <br />of the Work (unless such an interpretation of <br />the provisions of the Contract Documents <br />would result in violation of such Law or <br />Regulation). <br />3.04 Amending and Supplementing Contract <br />Documents <br />A. The Contract Documents may be amended to <br />provide for additions, deletions and revisions in the <br />Work or to modify the terms and conditions thereof in <br />o ne or more of the following ways (i) a Written <br />Amendment; (ii) a Change Order; or (iii) a Work <br />Change Directive. <br />B. The requirements of the Contract Documents <br />may be supplemented, and minor variations and <br />deviations in the Work may be authorized, by one or <br />more of the following ways: (1) a Field Order; (ii) <br />E NGINEER's approval of a Shop Drawing or Sample; <br />o r (iii) ENGINEER's written interpretation or clarifi- <br />cation. <br />3.05 Reuse of Documents <br />• <br />A. CONTRACTOR and any Subcontractor or <br />S upplier or other individual or entity performing or <br />furnishing any of the Work under a direct or indirect <br />contract with OWNER: (i) shall not have or acquire <br />any title to or ownership rights in any of the Drawings, <br />Specifications, or other documents (or copies of any <br />thereof) prepared by or bearing the seal of <br />ENGINEER or ENGINEER's Consultant, including <br />e lectronic media editions; and (ii) shall not reuse any <br />of such Drawings, Specifications other documents, or <br />copies thereof on extensions of the Project or any <br />other project without written consent of OWNER and <br />ENGINEER and specific wntten verification or <br />adaption by ENGINEER. This prohibition will survive <br />final payment, completion, and acceptance of the <br />Work, or termination or completion of the Contract. <br />N othing herein shall preclude CONTRACTOR from <br />retaining copies of the Contract Documents for record <br />purposes. <br />ARTICLE 4 - AVAILABILITY OF LANDS; <br />SUBSURFACE AND PHYSICAL CONDITIONS; <br />REFERENCE POINTS <br />4.01 Availability of Lands <br />A. OWNER shall furnish the Site. OWNER shall <br />n otify CONTRACTOR of any encumbrances or <br />restrictions not of general application but specifically <br />related to use of the Site with which CONTRACTOR <br />must comply in performing the Work. OWNER will <br />obtain in a timely manner and pay for easements for <br />permanent structures or permanent changes in <br />existing facilities. If CONTRACTOR and OWNER are <br />unable to agree on entitlement to or on the amount or <br />extent, if any, of any adjustment in the Contract Price <br />o r Contract Times, or both as a result of any delay in <br />OWNER's furnishing the Site, CONTRACTOR may <br />00700 - General Conditions REV 5-10-13 doc <br />00700 - 10 <br />F:\Public Works ENGINEERING DIVISION PROJECTS\12131IRC Shooting Range -Skeet 8 Trap Improvemnts 8 Hunters Train Bldg\Admim\bid documents\Contract Documents00700 - <br />General Conditions REV 5-10-13.doc <br />