Laserfiche WebLink
NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN <br /> EXTENSIONS FOR PWSs <br /> Pro' ect Name : 92nd Court Waterline Extension I Permittee : N/A <br /> 2 . Explanation of Peaking Factor(s) or Method(s) Used to Estimate Design Peak-Hour Water Demand and , for Small Water <br /> Systems that Use Hydropneumatic Tanks or that Are Not Designed to Provide Fire Protection, Peak Instantaneous Water <br /> Demand : PHD = ADD x 4 / 24 hour = (500 x 4)/24 = 83 gph <br /> J . Design Fire-Flow, Rate and Duration : 750 GPM for 4 hours <br /> 4 . Design Service Pressure Range : 50-60 psi <br /> B . Project Site Information <br /> 1 . ATTACH A SITE PLAN OR SKETCH SHOWING THE SIZE AND APPROXIMATE LOCATION OF NEW OR ALTERED <br /> WATER MAINS, SHOWING THE APPROXIMATE LOCATION OF HYDRANTS, VALVES, METERS, AND BLOW- <br /> OFFS IN SAID MAINS, AND SHOWING HOW SAID MAINS CONNECT TO THE PUBLIC WATER SYSTEM <br /> SUPPLYING WATER FOR THE PROJECT. <br /> 2 . Description of Any Areas Where New or Altered Water Mains Will Cross Above or Under Surface Water or Be Located in <br /> Soil that Is Known to Be Aggressive : No known aggressive soils. <br /> C . Information About Compliance with Design and Construction Requirements <br /> I . if this project is being designed to comply with the following requirements, initial m ink before the requirements. If any of the <br /> following requirements do not apply to this project or if this project includes exceptions to any of the following requirements as <br /> allowed by rule, mark "X" before the requirements and complete Part II .C .2 below. RSWW = Recommended Standards for <br /> Watt Works as incorporated into Rule 62-555 .330, F.A .C . <br /> ,(j 7 a. This project is being designed to keep existing water mains and service lines in operation during construction <br /> �I or to minimize interruption of water service during construction. [RSWW 1 .3 . a; exceptions allowed under FAC 62- <br /> A1 _ 555 . 330] <br /> b. All pipe, pipe fittings, pipe joint packing and jointing materials, valves, fire hydrants, and meters installed <br /> �— under this project will conform to applicable American Water Works Association (AWWA) standards. [FAC <br /> 62-555 .320(2 ) )(b), RSWW 8.0, and AWWA standards as incorporated into FAC 62-555 .330; exceptions allowed under FAC 62- <br /> 555 .320(21 )(c)] <br /> c . All public water system components, excluding fire hydrants, that will be installed under this project and that <br /> will come into contact with drinking water will conform to NSF International Standard 61 as adopted in Rule <br /> 62-555 .3351 F.A.C., or other applicable standards, regulations, or requirements referenced in paragraph 62- <br /> 555 . 320(3 )(b), F.A .C . [FAC 62-555 . 320(3)(b); exceptions allowed under FAC 6M55 .320(3)(d)) <br /> d . All pipe and pipe fittings installed under this project will contain no more than 8 .0% lead, and any solder or <br /> flux used in this project will contain no more than 0 .2% lead. [FAC 62-555 .322] <br /> e . All pipe and pipe fittings installed under this project will be color coded or marked in accordance with <br /> subparagraph 62-555 .320(21 )(b)3 , F .A.C . , using blue as a predominant color. (Underground plastic pipe will <br /> be solid-wall blue pipe, will have a co-extruded blue external skin, or will be white or black pipe with blue <br /> stripes incorporated into, or applied to, the pipe wall ; and underground metal or concrete pipe will have blue <br /> stripes applied to the pipe wall . Pipe striped during manufacturing of the pipe will have continuous stripes that <br /> run parallel to the axis of the pipe, that are located at no greater than 90-degree intervals around the pipe , and <br /> that will remain intact during and after installation of the pipe. If tape or paint is used to stripe pipe during <br /> installation of the pipe, the tape or paint will be applied in a continuous line that runs parallel to the axis of the <br /> pipe and that is located along the top of the pipe; for pipe with an internal diameter of 24 inches or greater, tape <br /> or paint will be applied in continuous lines along each side of the pipe as well as along the top of the pipe. <br /> Aboveground pipe will be painted blue or will be color coded or marked like underground pipe .) [FAC 62- <br /> All 555 .320(21 )(b)3] <br /> f. All new or altered water mains included in this project are sized after a hydraulic analysis based on flow <br /> demands and pressure requirements . ATTACH A HYDRAULIC ANALYSIS JUSTIFYING THE SIZE OF <br /> ANY NEW OR ALTERED WATER MAINS WITH AN INSIDE DIAMETER OF LESS THAN THREE <br /> INCHES . [FAC 62=555.320(21 )(b) and RSWW 8. 1 ] <br /> DEP Form 62.555.900(7)Altemate Page 3 <br /> Effective August 28, 2003 . <br />