My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-186
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 10:51:37 AM
Creation date
10/1/2015 4:43:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/09/2012
Control Number
2012-186
Agenda Item Number
12.J.1
Entity Name
Jesse Roland and Catherine Michelle Barton-Roland
Jonathan Blake Gowen and Debbie Sue Gowen
Subject
Construction of Off-Site Utilities
Area
7760 92nd Court 7805 92nd Court
Supplemental fields
SmeadsoftID
11501
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN <br /> EXTENSIONS FOR PWSs <br /> Proiect me : 92nd Court Waterline Extension T Permittee : N/A <br /> g. The inside diameter of new or altered water mains that are included in this project and that are being designed <br /> to provide fire protection and serve fire hydrants will be at least six inches. [FAC 62-555 .320(21 )(b) and RSWW 8. 1 <br /> . 2] <br /> Isis New or altered water mains that are included in this project and that are not being designed to carry fire flows <br /> do not have fire hydrants connected to them . [FAC 62-555. 320(21 )(b) and RSWW 8. 1 . 5] <br /> i . This project is being designed to minimize dead-end water mains by making appropriate tie-ins where <br /> practical . [FAC 62-555 . 320(21 )(b) and RSWW 8. 1 .6.a] <br /> j . New or altered dead-end water mains included in this project will be provided with a fire or flushing hydrant <br /> or <br /> blow-off for flushing purposes. [FAC 62 -555 . 320(21 )(b) and RSWW 8. 1 . 6. b] <br /> !t v/ k. Sufficient valves will be provided on new or altered water mains included in this project so that inconvenience <br /> and sanitary hazards will be minimized during repairs. [FAC 62-555 .320(21 )(b) and RSWW 8. 2] <br /> _ I . New or altered fire hydrant leads included in this project will have an inside diameter of at least six inches <br /> and <br /> will include an auxiliary valve. [ FAC 62-555 .320(21 )(b) and RSWW 8 .3 .3] <br /> m . All fire hydrants that will be installed under this project and that will have unplugged, underground drains will <br /> be located at least three feet from any existing or proposed storm sewer, stormwater force main , pipeline <br /> conveying reclaimed water regulated under Part III of Chapter 62-610 , F . A. C., or vacuum-type sanitary sewer; <br /> at least six feet from any existing or proposed gravity- or pressure-type sanitary sewer, wastewater force main , <br /> or pipeline conveying reclaimed water not regulated under Part III of Chapter 62- 10, F.A .C. ; and at least ten <br /> feet from any existing or proposed "on-site sewage treatment and disposal system . " [FAC 62-555 . 314(4)] <br /> Xn . At high points where air can accumulate in new or altered water mains included in this project, provisions will <br /> be made to remove the air by means of air relief valves, and automatic air relief valves will not be used in <br /> situations where flooding of the valve manhole or chamber may occur. [FAC 62-555 . 320(21 )(b) and RSWW 8 .4 . 1 ] <br /> o. The open end of the air relief pipe from all automatic air relief valves installed under this project will be <br /> extended to at least one foot above grade and will be provided with a screened, downward-facing elbow. [FAC <br /> 62-555 .320(21 )( b) and RSWW 8 .4 .2] <br /> p . New or altered chambers, pits, or manholes that contain valves, blow-offs, meters, or other such water <br /> distribution system appurtenances and that are included in this project will not be connected directly to any <br /> sanitary or storm sewer, and blow-offs or air relief valves installed under this project will not be connected <br /> directly to any sanitary or storm sewer. [FAC 62-555 . 320(21 )(b) and RSWW 8.4.3] <br /> q . New or altered water mains included in this project will be installed in accordance with applicable AWWA <br /> standards or in accordance with manufacturers' recommended procedures. [FAC 62-555 .320(21 )(b), RSWW 8. 5 . ► , and <br /> " 1� AWWA standards as incorporated into FAC 62-555.330] <br /> )7 7 r. A continuous and uniform bedding will be provided in trenches for underground pipe installed under this <br /> project; backfill material will be tamped in layers around underground pipe installed under this project and to a <br /> sufficient height above the pipe to adequately support and protect the pipe ; and unsuitably sized stones (as <br /> described in applicable AWWA standards or manufacturers' recommended installation procedures) found in <br /> trenches will be removed for a depth of at least six inches below the bottom of underground pipe installed <br /> under this project. [FAC 62-555 .320(21 )(b), RSWW 8.5 .2] <br /> s . All water main tees, bends, plugs, and hydrants installed under this project will be provided with thrust blocks <br /> or restrained joints to prevent movement. [FAC 62-555 .320(21 )(b) and RSWW 8 .5.4] <br /> t. New or altered water mains that are included in this project and that will be constructed of asbestos-cement or <br /> polyvinyl chloride pipe will be pressure and leakage tested in accordance with AWWA Standard C603 or <br /> C605, respectively, as incorporated into Rule 62-555 .330, F .A.C ., and all other new or altered water mains <br /> included in this project will be pressure and leakage tested in accordance with AWWA Standard C600 as <br /> incorporated into Rule 62-555 .330 . [FAC 62-555 .320(21 )(b) 1 and AWWA standards as incorporated into FAC 62-555 . 330] <br /> u . New or altered water mains, including fire hydrant leads and including service lines that will be under the <br /> control of a public water system and that have an inside diameter of three inches or greater, will be disinfected <br /> and bacteriologically evaluated in accordance with Rule 62-555 .340, F .A. C . [FAC 62-555 .320(21 )(b)2 and FAC 62- <br /> 555 .340) <br /> v. New or altered water mains that are included in this project and that will be installed in areas where there are <br /> known aggressive soil conditions will be protected through use of corrosion-resistant water main materials, <br /> through encasement of the water mains in polyethylene, or through provision of cathodic protection . [FAC 62- <br /> 555 .320(21 )(b) and RSWW 8. 5 . 7.d] <br /> DEP Form 62-555.900(7)A1temato Page 4 <br /> Effective August 28, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.