My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-186
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 10:51:37 AM
Creation date
10/1/2015 4:43:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/09/2012
Control Number
2012-186
Agenda Item Number
12.J.1
Entity Name
Jesse Roland and Catherine Michelle Barton-Roland
Jonathan Blake Gowen and Debbie Sue Gowen
Subject
Construction of Off-Site Utilities
Area
7760 92nd Court 7805 92nd Court
Supplemental fields
SmeadsoftID
11501
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTfCE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN <br /> EXTENSIONS FOR PWSs <br /> Proiect Name : 92nd Court Waterline Extension I Permittee : N/A <br /> w. New or relocated, underground water mains included in this project will be laid to provide a horizontal distance <br /> of at least three feet between the outside of the water main and the outside of any existing or proposed vacuum- <br /> type sanitary sewer, storm sewer, stormwater force main , or pipeline conveying reclaimed water regulated <br /> under Part III of Chapter 62-610, F. A .C . ; a horizontal distance of at least six feet between the outside of the <br /> water main and the outside of any existing or proposed gravity4ype sanitary sewer (or a horizontal distance of <br /> at least three feet between the outside of the water main and the outside of any existing or proposed gravity- . <br /> type sanitary sewer if the bottom of the water main will be laid at least six inches above the top of the sewer); a <br /> horizontal distance of at least six feet between the outside of the water main and the outside of any existing or <br /> proposed pressure-type sanitary sewer, wastewater force main, or pipeline conveying reclaimed water not <br /> regulated under Part III of Chapter 62-610, F.A .C . ; and a horizontal distance of at least ten feet between the <br /> outside of the water main and all parts of any existing or proposed " on-site sewage treatment and disposal <br /> system . " [FAC 62-555 .314( 1 ); exceptions allowed under FAC 62-555 .314( 5 )] <br /> x . New or relocated, underground water mains that are included in this project and that will cross any existing or <br /> proposed gravity- or vacuum-type sanitary sewer or storm sewer will be laid so the outside of the water main is <br /> at least six inches above the other pipeline or at least 12 inches below the other pipeline; and new or relocated ; <br /> underground water mains that are included in this project and that will cross any existing or proposed pressure- <br /> type sanitary sewer, wastewater or stormwater force main, or pipeline conveying reclaimed water will be laid <br /> so the outside of the water main is at least 12 inches above or below the other pipeline. [FAC 62-555 .314(2); <br /> exceptions allowed under FAC 62-555 .314(5)1 <br /> y . At the utility crossings described in Part II .C . 1 .w above, one full length of water main pipe will be centered <br /> above or below the other pipeline so the water main joints will be as far as possible from the other pipeline or <br /> the pipes will be arranged so that all water main joints are at least three feet from all joints in vacuum-type <br /> sanitary sewers, storm sewers, stormwater force mains, or pipelines conveying reclaimed water regulated under <br /> Part III of Chapter 62-610, F.A .C . , and at least six feet from all joints in gravity- or pressure-type sanitary <br /> sewers, wastewater force mains, or pipelines conveying reclaimed water not regulated under Part Ill of Chapter <br /> 62-6105 F.A.C. [FAC 62-555.314(2); exceptions allowed under FAC 62-555 .314(5)] <br /> z. New or altered water mains that are included in this project and that will cross above surface water will be <br /> adequately supported and anchored, protected from damage and freezing, and accessible for repair or <br /> replacement. [FAC 62-555 .320(21 )(b) and RSWW 8. 7. 11 <br /> aa. New or altered water mains that are included in this project and that will cross under surface water will have a <br /> minimum cover of two feet. [FAC 62-555 .320(21 )(b) and RSWW 8.7.2] <br /> A4 bb. New or altered water mains that are included in this project and that will cross under surface water courses <br /> greater than 15 feet in width will have flexible or restrained, watertight pipe joints and will include valves at <br /> both ends of the water crossing so the underwater main can be isolated for testing and repair; the <br /> aforementioned isolation valves will be easily accessible and will not be subject to flooding; the isolation valve <br /> closest to the water supply source will be in a manhole ; and permanent taps will be provided on each side of the <br /> isolation valve within the manhole to allow for insertion of a small meter to determine leakage from the <br /> underwater main and to allow for sampling of water from the underwater main . [FAC 62-555 .320(21 )(b) and RSWW <br /> 8.7 .2] <br /> cc . This project is being designed to include proper backflow protection at those new or altered service <br /> connections where backflow protection is required or recommended under Rule 62-555 .360, F.A.C. , or in <br /> Recommended Practice for Backflow Prevention and Cross-Connection Control, AWWA Manual M 14, as <br /> incorporated into Rule 62-555 . 330 , F.A .C. ; or the public water system that will own this project after it is <br /> placed into operation has a cross-connection control program requiring water customers to install proper <br /> backflow protection at those service connections where backflow protection is required or recommended under <br /> Rule 62-555 . 360, F .A .C . , or in AWWA Manual M14 . [FAC 62-555 .360 and AWWA Manual M14 as incorporated into <br /> FAC 62-555 .330] <br /> dd. Neither steam condensate, cooling water from engine jackets, nor water used in conjunction with heat <br /> exchangers will be returned to the new or altered water mains included in this project. [FAC 62-555 .320(21 )(b) and <br /> RSWW 8. 8 .2] <br /> DEP Form 62-555;900(7)Altemate Page 5 <br /> Effective August 28, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.