My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-039B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-039B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2015 10:43:05 AM
Creation date
10/1/2015 5:15:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/19/2013
Control Number
2013-039B
Agenda Item Number
8.H.
Entity Name
Andrew Sitework of Ft. Myers, Fl.
Subject
Vero Shores Pump Station No. 143 Force Main Replacement
Area
East of Young's Market FEC Railway to Old Dixie
Bid Number
2013019
Supplemental fields
SmeadsoftID
11872
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21913 <br /> SECTION 00530 - EJCDC a 43 ~- � <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> Bid No . 2013019 <br /> VERO SHORES PUMP STATION No . 143 FORCE MAIN REPLACEMENT <br /> THIS AGREEMENT ("Agreement" or " Contract") dated February 19, 2013 by and between Indian <br /> River County , a political subdivision of the State of Florida ("OWNER") and Andrew Sitework of <br /> Fort Myers, FL (" CONTRACTOR") . <br /> BACKGROUND RECITALS <br /> A. Pursuant to applicable provisions of Florida law, OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents as defined in Article 8 of this <br /> Agreement and the term is as set forth in the Contract Documents . <br /> B . CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents . <br /> NOW THEREFORE , OWNER and CONTRACTOR , in consideration of the mutual covenants <br /> hereinafter set forth , and intending to be legally bound , agree as follows : <br /> ARTICLE 1 WORK <br /> 1 . 1 . CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> complete all of the necessary labor, material , and equipment to perform the work as specified <br />or <br /> indicated in the Contract Documents . CONTRACTOR shall complete all work as specified or <br /> indicated in the Contract Documents . The work is generally described as follows , and shall include , <br /> but is not necessarily limited to the following : <br /> Construction of approximately 700 LF of 12 " HDPE Directional Bore <br /> Force Main , 400 LF of 10 " PVC Force Main and associated <br /> appurtenances from County Lift Station No. 143 ( behind and east of <br /> Young 's Market) west under US 1 and the FEC Railway to Old Dixie <br /> Highway. Construction consists of, but is not limited to, utilities <br /> exploration , coordination with any permitting agencies , trenching , <br /> dewatering , installation of pipe with fittings and all appurtenances , 12" <br /> directional bores , 10 " PVC pipe , valves , wet taps , ARV's , restrainers , soil <br /> compaction , testing , non -paved road and drive restorations , sod , private <br /> property replacement or repair, franchise utility repair traffic control and <br /> construction staking . PVC pipe shall be C -900 and HDPE shall be DR 11 <br /> per Indian River County Utility Standards and specifications . Contractor <br /> is responsible for removal and disposal of excess drilling mud . <br /> ARTICLE 2 ENGINEER <br /> 2 . 1 . The project has been designed by Gordon E . Sparks , P. E . hereinafter called <br /> ENGINEER , and who is to act as OWNER' S representative , assume all duties and responsibilities <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.