My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-123
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 11:53:57 AM
Creation date
10/1/2015 2:14:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2010
Control Number
2010-123
Agenda Item Number
12.I.3.
Entity Name
Applied Technology and Management
Subject
Sector 1 and 2 Ambersand Beach Restoration
Work Order No. 16
Supplemental fields
SmeadsoftID
9686
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A Scope of Services <br /> ell 11 ell <br /> April 2010 <br /> Work Order 16 <br /> Indian River County Beach <br /> Sectors 1 & 2 <br /> Post - Project Monitoring ( 2010 ) <br /> INTRODUCTION <br /> The sand placement for the limited renourishment of the Ambersand project was broken into two <br /> phases . Phase I , placement of sand from the Sebastian Inlet Sand Trap , was performed under a <br /> FDEP partial notice to proceed ( NTP ) , and allowed for placement of sand dredged from the <br /> Sebastian Inlet sand trap to be placed on the dry beach ( landward of the MHW line ) . The Phase I <br /> portion of the project was completed in May 2006 under contract with Great Lakes Dredge and <br /> Dock , Inc . ( GLDD ) . Pre-Construction baseline biological monitoring was performed in the <br /> summer/fall of 2007 , and FDEP issued the County a full NTP to complete Phase II of this project . <br /> Phase II placed approximately 160 , 000 c . y . from the offshore borrow site , resulting in a total <br /> construction volume of approximately 258 , 000 c . y . Sand placement was completed on December <br /> 291 2007 , and Final Completion was provided to GLDD on March 26 , 2008 <br /> Based on clarification from FDEP (4/7/08 e- mail from Ms . Childs ) regarding the permit- required <br /> monitoring schedule , the biological and physical monitoring survey schedules are off-set by one <br /> year. The biological portion of the 2010 post-project monitoring effort will be the 2"d Year Post- <br /> Construction Biological Survey. The physical portion of the 2010 post- project monitoring effort will <br /> be the 3rd Year Post- Construction Physical Survey. <br /> This scope of work includes tasks to perform and fulfill the permit- required post- project monitoring <br /> and reporting for 2010 . <br /> Task 1 Biological Monitoring and Reporting ( 2"d Year Post-Construction ) <br /> The FDEP permit requires biological monitoring following the construction . Continental Shelf <br /> Associates International , Inc . ( CSA) will perform the biological monitoring , Costal Eco-Group , Inc . <br /> ( CEG ) will perform required 2nd party quality assurance of the monitoring data , and ATM will <br /> perform necessary quality control on the reporting of the data per the DEP -approved Biological <br /> Monitoring Plan ( February 6 , 2007 ) . Work will include surveying the ten transects established <br /> under previous surveys ( R -5 , R -6 . 51 R -81 R -9 . 51 R - 10 . 51 R - 121 R - 14 . 21 R - 16 . 9 , R - 19 . 5 , and <br /> R -22 ) . <br /> The data collection will include collecting video transects , quadrat and sediment thickness data , <br /> and surveying the nearshore edge . A comparison of the data collected under this scope of <br /> services will be made to prior project datasets . If weather or visibility conditions prevent the <br /> collection of data , contingency monitoring will occur per protocol . The budget allocated to filed <br /> work , including contingency days and visibility checks is up to 10 days . <br /> ATM and CEG will coordinate with FDEP and USACE on nearshore conditions and efforts <br /> undertaken as part of this task . The consultants and the County will have weekly teleconferences <br /> to coordinate efforts . <br /> ATM and CSA will provide the County with regular updates via e- mail or teleconferences of the <br /> field efforts , and a report presenting the data and an analysis of the data . <br />