My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-123
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 11:53:57 AM
Creation date
10/1/2015 2:14:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2010
Control Number
2010-123
Agenda Item Number
12.I.3.
Entity Name
Applied Technology and Management
Subject
Sector 1 and 2 Ambersand Beach Restoration
Work Order No. 16
Supplemental fields
SmeadsoftID
9686
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 Aerial Photography <br /> This task allows for the collection , rectification and geo - referencing of orthogonal aerial <br /> photography from R - 1 through R -22 per the DEP -approved Physical Monitoring Plan ( February 2 , <br /> 2007 ) . Two reconnaissance flights are included as an effort to capture clear , high water visibility <br /> conditions . <br /> ATM will provide the County with a set of aerial photographs and digital copies (with world files ) of <br /> the aerials in TIF and JPG format . <br /> Task 3 Borrow Area Hydrographic Survey <br /> ATM will perform bathymetric surveys of the offshore borrow sites , which are identified as the <br /> Sectors 1 & 2 Primary Borrow Area ( formerly the Sector 7 Borrow Site ) and the Sectors 1 & <br /> 2 <br /> Secondary Borrow Area ( formerly known as the Sectors 1 & 2 Borrow Site ) . The bathymetric <br /> surveys will be conducted in accordance with the DEP -approved Physical Monitoring Plan . To be <br /> consistent with prior surveys , truckline line spacing will be 400 feet for the Primary Borrow Area <br /> and 500 feet for the Secondary Borrow Area . Included in this task is one weather day should <br /> inclement weather occur during the survey necessitating a re - mobilization to compete the survey . <br /> The Sebastian Inlet District will be conducting a bathymetric survey of the Sebastian Inlet Sand <br /> Trap , and has agreed with the County to share the data with ATM . The Sebastian Inlet Sand Trap <br /> survey dataset will be required to complete the physical monitoring report . <br /> ATM will provide the County with an xyz data file and drawings ( 11 x17 format) showing the survey <br /> data and bathymetric contours . <br /> Task 4 Beach Profile Survey <br /> Morgan & Eklund will perform the beach profile survey data collection and data reduction . Beach <br /> profile will include R - 1 through R -22 . All data collected will be accordance with the DEP -approved <br /> Physical Monitoring Plan . ATM will provide review of submittals and project coordination as <br /> necessary , provide the County with beach profile data in ASCII file format , CAD drawings , and <br /> drawings ( 11x17 format) signed by the surveyor. <br /> Task 5 Physical Monitoring Report ( 3'd Year Post-Construction ) <br /> ATM will analyze the project data and prepare a physical monitoring report per the DEP -approved <br /> Physical Monitoring Plan . The report will include reporting of the pre -and post-construction <br /> surveys of the beach profiles and borrow site . ATM will analyze the data for placed sand <br />, <br /> shoreline and volume changes and the post- project condition of the borrow site . ATM will provide <br /> the FDEP with aerial photography ( rectified and geo- referenced under a separate work order) . <br /> ATM will prepare the 3rd Year Post-Construction Physical Monitoring Report as necessary . The <br /> County will provide ATM with comments to a draft version , and ATM will distribute the report as <br /> necessary . <br /> ATM will provide the County with one draft report for review , and distribute final copies to the <br /> County and regulatory agencies . <br /> Task 6 Sea Turtle Nest Monitoring <br /> Ecological Associates Inc . ( EAI ) will provide sea turtle nesting surveys per Florida Fish and <br /> Wildlife Conservation Commission ( FWC ) and DEP - permit requirements for the Post-Construction <br /> Nesting Season monitoring period . EAI will also perform pre -season tasks including compaction <br />
The URL can be used to link to this page
Your browser does not support the video tag.