My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-237
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:55:17 AM
Creation date
10/1/2015 2:29:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/05/2010
Control Number
2010-237
Agenda Item Number
8.N.
Entity Name
Arcadis G&M Inc.
Subject
Amendment No. 8 Bridge Replacements and Widening of 66th Ave.
Area
south of SR 60 to 59th. St.
Supplemental fields
SmeadsoftID
9822
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'b <br /> area number 6 (Gamma Delta site) . The storm water drainage design including conveyance pipe <br /> system design and pond plans will be modified to reflect the new pond locations . The following <br /> plans will be modified to reflect the relocated pond sites : <br /> a Construction plans <br /> • Drainage structure sheets <br /> ® Drainage maps <br /> • Profiles <br /> In addition, a topographic survey of the new pond sites will be performed for the purpose of <br /> calculating earthwork volumes . <br /> During the right of way acquisition negotiations for the Plantation Plaza site , the property owners <br /> requested several plan modifications to address concerns they had . These modifications included a <br /> reduction in the size of the corner clip on SR 60 & 66`" Avenue, changes to the gravity wall to <br /> make the wall more aesthetically pleasing, and modifications to the access driveway to provide for <br /> radial curb returns and to reduce the width of the drive thru access aisle . In addition, the location <br /> of the trash dumpster enclosure will be relocated . <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER. and the <br /> COUNTY follows : <br /> Compensation will be on an hourly basis at the hourly rates listed below. <br /> ProjectEngineer Manager . . . . . . . . . . . . . . ... . . . . . . . .. . .. . . . . . . . . . . . . . . . . . $115. 00 <br /> ProjectEngineer . . . .. . . . ... .. . . . . . . . . . . . . . .. . . . . . . ... . . . . . . . . . . . . . . . . . . . . . .. . . . . . . $95. 00 <br /> SeniorCADDOperator. . . ... . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . . . . . .. . . . $ 70. 00 <br /> Survey Project Manager . . . . . . . $106. 40 <br /> Professional Surveyor . .. . . . . . . . $ 75. 60 <br /> SurveyCADD Tech .. . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .... . . . . . . .. . . $58. 80 <br /> 3 Man Field Crew . . . .... . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . .. ... . . . . . . . . . . ... . . . . . . $112. 00 <br /> Sr. Field Coordinator.. . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . ... . . . . . . $95. 00 <br /> FieldCoordinator. .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . .. . . . $ 75. 00 <br /> FieldRepresentative . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . .. . . . . . . . . . . . $ 70. 00 <br /> Page 2 of 5 <br /> G :\LNR Support\ADMIN \Marketing\Proposals\WPB\2010\66 th Ave Amendment No 8 8 -27 - 10 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.