Laserfiche WebLink
Pond Surveys ................ $0. 00 $2531790. 00 <br /> Water Main Plans (ARCADIS) ............................................................... $0. 00 $86,145. 00 <br /> (Lump Sum) <br /> Corridor Study (ARCADIS) ................................................................... . $0. 00 $15, 581. 00 <br /> Cultural Resource Assessment...................................... .......................... $0. 00 $8, 925. 93 <br /> TOTAL PROFESSIONAL SERVICES ............................................ $30, 945. 00 $2, 019, 680. 09 <br /> HOURLYRATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking of parcels (3 75. 00leach) ............................ NTE $0. 00 $51,000. 00 <br /> Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations......................................:.... NTE $0. 00 $20,000. 00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts . <br /> (Survey $112/flr) ................................................................................. NTE $0. 00 $20, 000. 00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project............................................................ NTE $0. 00 $27000. 00 <br /> Construction Engineering Services........................................... NTE $29,877.12 $57,877.12 <br /> TOTAL HO URL YRATEALLOWANCES.............................. NTE $29,877.12 $175,877.12 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the hourly <br /> rates listed below: <br /> Project Engineer Manager..............................................:........ $14064 <br /> ProjectEngineer..........:......................................................:....... $109 70 <br /> Senior CADD Operator................................................................ $85. 84 . <br /> CaddDraftsman............................................................................ $5089 <br /> Survey Project Manager............................................................. $10040 <br /> ProfessionalSurveyor................................................................... $98.30 <br /> Survey CADD Tech ...................................................................... $68017 <br /> 3 Man Field Crew....................................................................... $12084 <br /> 2 Man Field Crew....................................................................... $114. 14 . <br /> Sr. Field Coordinator ................................................................... $ 75. 00 <br /> Page 3 of 4 <br /> F :\Pubhc Works\ENGINEERING DMSION PROJECTS\0545-66Th Ave SR60 to 57th St <br /> (Arcadis)Wdmim\Contracts\66 th Ave Amendment No 12 10- 1842 .doc <br /> I - <br />