My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-199
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:08:53 AM
Creation date
10/1/2015 4:45:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
11/06/2012
Control Number
2012-199
Agenda Item Number
8.H.
Entity Name
Arcadis U.S.
Subject
Amendment No. 12
Bridge Replacements Widening 66th Ave.
Area
South of SR 60 to North of 57th. Street
Project Number
0545
Supplemental fields
SmeadsoftID
11538
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond Surveys ................ $0. 00 $2531790. 00 <br /> Water Main Plans (ARCADIS) ............................................................... $0. 00 $86,145. 00 <br /> (Lump Sum) <br /> Corridor Study (ARCADIS) ................................................................... . $0. 00 $15, 581. 00 <br /> Cultural Resource Assessment...................................... .......................... $0. 00 $8, 925. 93 <br /> TOTAL PROFESSIONAL SERVICES ............................................ $30, 945. 00 $2, 019, 680. 09 <br /> HOURLYRATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking of parcels (3 75. 00leach) ............................ NTE $0. 00 $51,000. 00 <br /> Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations......................................:.... NTE $0. 00 $20,000. 00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts . <br /> (Survey $112/flr) ................................................................................. NTE $0. 00 $20, 000. 00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project............................................................ NTE $0. 00 $27000. 00 <br /> Construction Engineering Services........................................... NTE $29,877.12 $57,877.12 <br /> TOTAL HO URL YRATEALLOWANCES.............................. NTE $29,877.12 $175,877.12 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the hourly <br /> rates listed below: <br /> Project Engineer Manager..............................................:........ $14064 <br /> ProjectEngineer..........:......................................................:....... $109 70 <br /> Senior CADD Operator................................................................ $85. 84 . <br /> CaddDraftsman............................................................................ $5089 <br /> Survey Project Manager............................................................. $10040 <br /> ProfessionalSurveyor................................................................... $98.30 <br /> Survey CADD Tech ...................................................................... $68017 <br /> 3 Man Field Crew....................................................................... $12084 <br /> 2 Man Field Crew....................................................................... $114. 14 . <br /> Sr. Field Coordinator ................................................................... $ 75. 00 <br /> Page 3 of 4 <br /> F :\Pubhc Works\ENGINEERING DMSION PROJECTS\0545-66Th Ave SR60 to 57th St <br /> (Arcadis)Wdmim\Contracts\66 th Ave Amendment No 12 10- 1842 .doc <br /> I - <br />
The URL can be used to link to this page
Your browser does not support the video tag.