Laserfiche WebLink
{ <br /> 4 . <br /> requests for additional information and to address unforeseen construction issues that may arise. <br /> The estimated hourly not to exceed fee included in this supplement is based on providing <br /> professional engineering services for three hours per week during the 52 week construction time <br /> period. <br /> "SECTION IV TIME FOR COMPLETION" is being modified to incorporate the <br /> following: <br /> The time for completion of the plan revisions included in this amendment shall be sixty (60) days <br /> from the date of the notice to proceed. <br /> "SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following. <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows : <br /> The following is a summary of costs: <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Proiect Limits Compensation <br /> Geotechnical Services (T erra)(Lump Sum) ............................................ $0. 00 $139,460. 00 <br /> Engineering (ARCADIS) (Lump Sum) ........................................... $30,945. 00 $953, 975. 50 <br /> Signal Plans (ARCADIS)............................................................................ $.0. 00 $84, 72066 <br /> Design Survey (66'* Avenue) (ARCADIS) .................................................. $0. 00 $169,500. 00 <br /> Design Survey (Sidestreets) (ARCADIS)..................................................... $0. 00 $ 71,428. 00 <br /> Right-of- Way Survey and Map (66`h Avenue).................................:00000000090 $0. 00 $1179821. 00 <br /> Right-of-way Survey (Sidestreets)................................................................ $0. 00 $61, 963. 00 <br /> Structural Design for 4 bridges <br /> (Bridge Design Associates, $0. 00 $207,222. 00 <br /> Landscape & Irrigation................................................................................ $0. 00 $ 77,160. 00 <br /> (Thomas Lucido & Associates) (Lump Sum) <br /> Page 2 of 4 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St <br /> (Arcadis)Wdmim\Contracts\66 th Ave Amendment No 12 104842 .doc <br /> � _r <br />