My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-199
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:08:53 AM
Creation date
10/1/2015 4:45:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
11/06/2012
Control Number
2012-199
Agenda Item Number
8.H.
Entity Name
Arcadis U.S.
Subject
Amendment No. 12
Bridge Replacements Widening 66th Ave.
Area
South of SR 60 to North of 57th. Street
Project Number
0545
Supplemental fields
SmeadsoftID
11538
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> 4 . <br /> requests for additional information and to address unforeseen construction issues that may arise. <br /> The estimated hourly not to exceed fee included in this supplement is based on providing <br /> professional engineering services for three hours per week during the 52 week construction time <br /> period. <br /> "SECTION IV TIME FOR COMPLETION" is being modified to incorporate the <br /> following: <br /> The time for completion of the plan revisions included in this amendment shall be sixty (60) days <br /> from the date of the notice to proceed. <br /> "SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following. <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows : <br /> The following is a summary of costs: <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Proiect Limits Compensation <br /> Geotechnical Services (T erra)(Lump Sum) ............................................ $0. 00 $139,460. 00 <br /> Engineering (ARCADIS) (Lump Sum) ........................................... $30,945. 00 $953, 975. 50 <br /> Signal Plans (ARCADIS)............................................................................ $.0. 00 $84, 72066 <br /> Design Survey (66'* Avenue) (ARCADIS) .................................................. $0. 00 $169,500. 00 <br /> Design Survey (Sidestreets) (ARCADIS)..................................................... $0. 00 $ 71,428. 00 <br /> Right-of- Way Survey and Map (66`h Avenue).................................:00000000090 $0. 00 $1179821. 00 <br /> Right-of-way Survey (Sidestreets)................................................................ $0. 00 $61, 963. 00 <br /> Structural Design for 4 bridges <br /> (Bridge Design Associates, $0. 00 $207,222. 00 <br /> Landscape & Irrigation................................................................................ $0. 00 $ 77,160. 00 <br /> (Thomas Lucido & Associates) (Lump Sum) <br /> Page 2 of 4 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St <br /> (Arcadis)Wdmim\Contracts\66 th Ave Amendment No 12 104842 .doc <br /> � _r <br />
The URL can be used to link to this page
Your browser does not support the video tag.