Laserfiche WebLink
BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE 0503 <br /> 0 31 1 <br /> FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET 8 ' ` <br /> a6 / / - IDC <br /> PROFESSIONAL CIVIL ENGINEERING , GEOTECHNICAL ENGINEERING <br /> AND LAND SURVEYING SERVICES <br /> AMENDMENT NO . 9 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br /> SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. AND INDIAN RIVER <br /> COUNTY, FLORIDA. <br /> This is an amendment to the existing Engineering/Land Surveying Services Agreement <br /> (AGREEMENT) dated September 6 , 2005 between ARCADIS US , Inc . (ENGINEER) and <br /> Indian River County (COUNTY) . This amendment addresses changes in " Section I — Project <br /> Limits and Description" , " Section III - Scope of Services " , and " Section V - Compensation " . <br /> Amendment Description <br /> This Amendment includes the following : <br /> " SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate <br /> the following : <br /> Plans have been prepared for the construction of roadway and drainage improvements along 66th <br /> Avenue . The St . Johns River Water Management District ( SJRWMD) has requested <br /> modifications to the stormwater drainage plans to address permitting rules recently adopted by <br /> the Water Management District . The rule modifications require revisions to the subsurface storm <br /> drain piping systems , the stormwater drainage ponds , and the swales located on the intersecting <br /> side streets . The stormwater pond designs will be revised to provide for a dry retention treatment <br /> area in each pond in order to satisfy the SJRWMD ' s requirement for phosphorus removal . The <br /> stormwater piping system design will be modified to allow for discharge into the dry treatment <br /> areas . The side street swale designs will be modified to provide for the phosphorus loading <br /> criteria as well as the agencies drawdown criteria. <br /> The SJRWMD has requested geotechnical test results to demonstrate the permeability rate of the <br /> soils located within the side street swales and the pond sites . The previous geotechnical studies <br /> obtained permeability test results in only four locations along the project corridor . Additional <br /> permeability tests will be obtained and forwarded to the SJRWMD for their approval . <br /> In addition to the pond redesign , landscape plans will be prepared for each pond site . The <br /> landscape plans will include littoral plantings and lake bank plantings . The pond layouts will be <br /> revised to provide for the littoral zone for the planting areas . <br /> Irrigation plans have been prepared for the project utilizing wells for a water source . The County <br /> utilities department has determined that the irrigation water source should be reuse water. The <br /> irrigation plans will be revised to show connections to the existing reuse water main, and the <br /> Page 1 of 4 <br /> C : \Documents and Settings\aweragoda\Local Settings\Temporary Internet Files\OLK61 \66 th Ave Amendment No 9 <br /> 4- 15 - 11 . doc <br />