My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-102
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:33:57 PM
Creation date
10/1/2015 2:12:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
05/03/2011
Control Number
2011-102
Agenda Item Number
8.G.
Entity Name
Arcadis US Inc.
Subject
Amendment No. 9 professional services
Bridge Replaement and Widening 66th Ave.
Area
South of SR 60 to North of 57th St.
Supplemental fields
SmeadsoftID
9666
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irrigation zone plans will be revised to accommodate this request. In addition, irrigation plans <br /> will be prepared for the lake bank tree plantings . <br /> An hourly not to exceed amount was included in a previous amendment for the design of a <br /> transition to match the existing pavement at the north end of the project. This work was <br /> completed as requested by the County. The County anticipates that the construction of the project <br /> will be split into two or more additional phases . An additional amount of $ 15 , 000 . 00 has been <br /> added to the subject addendum for the design of an additional pavement transition at the location <br /> established by the County . Included in this allowance will be services associated with <br /> adjustments to the quantity estimates as necessary based on project phasing modifications . <br /> An hourly not to exceed amount of $20 , 000 . 00 has been added to the subject addendum to <br /> address any design changes due to right of way negotiations . These changes may include but not <br /> be limited to changes in driveway locations , widths , median openings , and turn lanes . <br /> An hourly not to exceed amount was included in a previous amendment for construction <br /> engineering services . This allowance was partially utilized during the construction of the first <br /> phase of the project, 66`" Avenue south of SR 60 . An additional amount of $ 13 , 000 . 00 has been <br /> added to the subject addendum for construction engineering services for subsequent phases of the <br /> project . <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows : <br /> The following is a summary of costs: <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Proiect Limits Compensation <br /> Geotechnical Services (Tierra) (Lump Sum) .. . . . . . . . . . . . . . . . . . . . . . . . $9,450. 00 $139,460. 00 <br /> Engineering (ARCADIS) (Lump Sum) . . . . . . * * * * * * * * $219942. 50 $842, 027. 50 <br /> Signal Plans (ARCADIS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . $0. 00 $ <br />71,344. 00 <br /> Page 2 of 4 <br /> C : \Documents and Settings\aweragoda\Local Settings\Temporary Internet Fi les\OLK6 1 \66 th Ave Amendment <br /> No 9 4- 15 - 11 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.