Laserfiche WebLink
irrigation zone plans will be revised to accommodate this request. In addition, irrigation plans <br /> will be prepared for the lake bank tree plantings . <br /> An hourly not to exceed amount was included in a previous amendment for the design of a <br /> transition to match the existing pavement at the north end of the project. This work was <br /> completed as requested by the County. The County anticipates that the construction of the project <br /> will be split into two or more additional phases . An additional amount of $ 15 , 000 . 00 has been <br /> added to the subject addendum for the design of an additional pavement transition at the location <br /> established by the County . Included in this allowance will be services associated with <br /> adjustments to the quantity estimates as necessary based on project phasing modifications . <br /> An hourly not to exceed amount of $20 , 000 . 00 has been added to the subject addendum to <br /> address any design changes due to right of way negotiations . These changes may include but not <br /> be limited to changes in driveway locations , widths , median openings , and turn lanes . <br /> An hourly not to exceed amount was included in a previous amendment for construction <br /> engineering services . This allowance was partially utilized during the construction of the first <br /> phase of the project, 66`" Avenue south of SR 60 . An additional amount of $ 13 , 000 . 00 has been <br /> added to the subject addendum for construction engineering services for subsequent phases of the <br /> project . <br /> " SECTION V — COMPENSATION" is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following : <br /> A . Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows : <br /> The following is a summary of costs: <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Proiect Limits Compensation <br /> Geotechnical Services (Tierra) (Lump Sum) .. . . . . . . . . . . . . . . . . . . . . . . . $9,450. 00 $139,460. 00 <br /> Engineering (ARCADIS) (Lump Sum) . . . . . . * * * * * * * * $219942. 50 $842, 027. 50 <br /> Signal Plans (ARCADIS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . $0. 00 $ <br />71,344. 00 <br /> Page 2 of 4 <br /> C : \Documents and Settings\aweragoda\Local Settings\Temporary Internet Fi les\OLK6 1 \66 th Ave Amendment <br /> No 9 4- 15 - 11 . doc <br />