My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:05:49 PM
Creation date
10/1/2015 5:43:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
10/22/2013
Control Number
2013-211B
Agenda Item Number
8.N.
Entity Name
Archie Smith Fish House
Subject
Archie Smith Fish House Restoration
Historical Preservation Grant Award
Development Project Matching Reimbursement
Project Number
S1429
Supplemental fields
SmeadsoftID
12580
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 23 <br /> that the Grantee shall be solely liable to the subcontractor for all expenses and liabilities incurred under <br /> the subcontract. <br /> K . The Grantee shall submit architectural planning documents to the Department for review and approval on <br /> the schedule indicated in Subsection VI . C . Construction documents (plans and specifications) for the <br /> project shall be approved in writing by the Department prior to the execution of any contract for <br /> construction work. <br /> L . Projects involving ground disturbance (examples include : historic building or structure relocation, <br /> grading and site work, installation of sewer and water lines, subgrade foundation repairs or damp <br /> proofing, construction requiring construction of new foundations, installation of landscape materials) , the <br /> Grantee shall ensure that the following requirements are included in all contracts for architectural and <br /> engineering services : <br /> 1 . The architect or engineer shall ensure the following : <br /> (a) Ground disturbance around historic buildings or elsewhere on the site shall be minimized, thus <br /> reducing the possibility of damage to or destruction of significant archaeological resources . <br /> (b) If an archaeological investigation of the Project site has not been completed, the architect or <br /> engineer shall contact the Department for assistance in determining the actions necessary to <br /> evaluate the potential for adverse effects of Project ground disturbing activities on significant <br /> archaeological resources . <br /> (c) Significant archaeological resources shall be protected and preserved in place whenever <br /> possible . Heavy machinery shall not be allowed in areas where significant archaeological <br /> resources may be disturbed or damaged. <br /> (d) When preservation of significant archaeological resources in place is not feasible, a mitigation <br /> plan shall be developed in consultation with and approved by the Department ' s Compliance <br /> Review Section (contact information available online at www. flheritage . com) . The mitigation <br /> plan shall be implemented under the direction of an archaeologist meeting the Secretary of the <br /> Interiors' Professional Qualification Standards for Archeology (available online at <br /> www . nps . gov/history/local- law/arch_stnds_9 . htm) . <br /> (e) Documentation of archaeological investigation and required mitigation actions shall be <br /> submitted to the Compliance Review Section for review and approval . This documentation <br /> shall conform to the Secretary of the Interior 's Standards for Archaeological Documentation , <br /> available online at www . nps . gov/history/local-law/arch stnds 7 . htm, and the reporting <br /> standards of the Compliance Review Section set forth in Chapter IA46, Florida <br /> Administrative Code. <br /> 2 . With prior written approval from the Department, archaeological consulting services costs required <br /> to identify and evaluate archaeological resources in areas of ground disturbance, and required to <br /> carry out the provisions of an approved mitigation plan, will be eligible for grant expenditure or <br /> contribution to the required match. <br /> M . The Grantee agrees that all acts to be performed by it in connection with this Agreement shall be <br /> performed in strict conformity with all applicable laws and regulations of the State of Florida. <br /> N . The Grantee shall coordinate consultation between its professional consultants and appropriate <br /> Department staff representatives as necessary to assure mutual understanding of and agreement on the <br /> objectives, requirements , and limitations of the Project in relation to the State Historic Preservation <br /> Program. <br /> O . Bills for fees or other compensation for services or expenses shall be submitted in detail sufficient for a <br /> proper pre-audit and post-audit thereof. The Grantee shall not charge the Department for any travel <br /> expense without the Department's prior written approval . Upon obtaining the Department ' s written <br /> approval, the Grantee shall be authorized to incur travel expenses for airfare, vehicle rental, mileage and <br /> DOS Form No . HR3E 1 208GAASM <br /> Reference : Rule IA -39. 009(1) (b), FAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.