My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-055
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:47:57 PM
Creation date
10/1/2015 4:14:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/20/2012
Control Number
2012-055
Agenda Item Number
15.A.2
Entity Name
Barth Construction
Subject
Fire Rescue Station 13 Phase II Agreement
Construction Services Agreement
Area
4th Street and 43rd Ave.
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment " A " <br /> BARTH <br /> Construction, Inc . <br /> General Contractor CGCO07847 <br /> I . R . C . Fire Station # 13 <br /> Phase II Scope of Work <br /> Design, Permitting & Coordination <br /> • All design and engineering for the maintenance building <br /> • All coordination, supervision and project management for the design and <br /> construction of maintenance building <br /> • Site plan design and landscape design are included in phase I <br /> • All construction permitting costs <br /> Site Demolition & Development <br /> • Grading for west retention pond, demo existing paving and concrete slab <br /> • Install drainage — 2 catch basins and pipe ( 136 LF of 18 " RCP , 80 LF of 15 " Rep) <br /> • 6" concrete paving (Phase II Only) signs , stripes <br /> • Import fill (approximately 1 , 800 cu . yd) <br /> • Landscape and irrigation for phase ll development area <br /> Maintenance Building <br /> • Design, permit and construct an 85 ' long x 55 ' wide x 24 ' tall pre -engineered <br /> metal building <br /> • 26 ga. PBR galvalume roof panels <br /> • 26 ga PBR paint wall panels and trim <br /> • 26 ga PBR gutters and downspouts <br /> • 3 " V . R. insulation in roof and walls <br /> • (2) 16 ' x 14 ' ceiling roll -up door — manual <br /> • ( 3 ) 3 degree x 7 degree walk doors and frames <br /> • ( 1 ) 8 ' x 18 ' x 10 ' high walkway roof between new and existing building <br /> • Concrete foundation and slab <br /> • ( 1 ) Emergency eye wash <br /> • (6) Hose bibs <br /> • New 400 amp 208v 3 phase electric service <br /> • ( 24 ) High- Bay light fixtures <br /> • ( 15 ) GFI receptacles <br /> • (2 ) Exhaust fans and (2 ) intake louvers <br /> • ( 3 ) Fire extinguishers <br /> 1717 Indian River Boulevard * Suite 202A * Vero Beach , Florida 32960 <br /> Phone : (772) 778-3072 * Fax : (772) 770-3017 <br /> E-mail : infibruti <br /> ;barthconstrucon , coin * Internet : wN��w . harthconstruction . coni <br />
The URL can be used to link to this page
Your browser does not support the video tag.