My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-055
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:47:57 PM
Creation date
10/1/2015 4:14:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/20/2012
Control Number
2012-055
Agenda Item Number
15.A.2
Entity Name
Barth Construction
Subject
Fire Rescue Station 13 Phase II Agreement
Construction Services Agreement
Area
4th Street and 43rd Ave.
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3 . 2 . 14 The Design/Builder shall notify the Owner when the Design/Builder believes <br /> that the Work or an agreed upon portion thereof is substantially completed . If the <br /> Owner concurs , the Design/ Builder shall issue a Certificate of Substantial Completion <br /> which shall establish the Date of Substantial Completion , shall state the responsibility of <br /> each party for security , maintenance , heat , utilities , damage to the Work and insurance , <br /> shall include a list of items to be completed or corrected and shall fix the time within <br /> which the Design/Builder shall complete items listed therein . Disputes between the <br /> Owner and Design/Builder regarding the Certificate of Substantial Completion shall be <br /> resolved in accordance with provisions of Article 10 . <br /> § 3 . 2 . 15 The Design/Builder shall maintain at the site for the Owner one record copy of <br /> the drawings , specifications , product data , samples , shop drawings , Change Orders and <br /> other modifications , in good order and regularly updated to record the completed <br /> construction . These shall be delivered to the Owner upon completion of construction <br /> and prior to final payment . <br /> § 3 . 3 ADDITIONAL SERVICES <br /> § 3 . 3 . 1 The services described in this Section 3 . 3 are not included in Basic Services <br /> unless so identified in Article 14 , and they shall be paid for by the Owner as provided in <br /> this Part 2 Agreement , in addition to the compensation for Basic Services . The services <br /> described in this Section 3 . 3 shall be provided only if authorized or confirmed in writing <br /> by the Owner . <br /> § 3 . 3 . 2 Making revisions in drawings , specifications , and other documents or electronic <br /> data when such revisions are required by the enactment or revision of codes , laws or <br /> regulations subsequent to the preparation of such documents or electronic data . <br /> § 3 . 3 . 3 Providing consultation concerning replacement of Work damaged by fire or other <br /> cause during construction , and furnishing services required in connection with the <br /> replacement of such Work . <br /> § 3 . 3 . 4 Providing services in connection with a publ+o hear+Rg , arbitration proceeding or <br /> legal proceeding , except where the Design/Builder is a party thereto . <br /> § 3 . 3 . 5 Providing coordination of construction performed by the Owner' s own forces or <br /> separate contractors employed by the Owner , and coordination of services required in <br /> connection with construction performed and equipment supplied by the Owner . <br /> § 3 . 3 . 6 Preparing a set of reproducible record documents or electronic data showing <br /> significant changes in the Work made during construction . <br /> § 3 . 3 Providing assistance in the utilization of equipment or systems such as <br /> preparation of operation and maintenance manuals , training personnel for operation and <br /> maintenance , and consultation during operation . <br /> ARTICLE 4 TIME <br /> § 4 . 1 Unless otherwise indicated , the Owner and the Design /Builder shall perform their <br /> respective obligations as expeditiously as is consistent with reasonable skill and care <br /> and t ie orderly progress of the Project . <br />
The URL can be used to link to this page
Your browser does not support the video tag.