My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-026
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 1:23:53 PM
Creation date
10/1/2015 5:07:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/05/2013
Control Number
2013-026
Agenda Item Number
15.A.2
Entity Name
Barth Construction
Subject
Fire Station No.13 Phase III Expansion
Area
Fire Station No.13
Supplemental fields
SmeadsoftID
11725
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment, tools , construction equipment and machinery, water, heat , utilities , <br /> transportation and other facilities and services necessary for proper execution and <br /> completion of the Work , whether temporary or permanent and whether or not <br /> incorporated or to be incorporated in the Work . <br /> § 3. 2 . 6 The Design/Builder shall be responsible for all construction means , methods , <br /> techniques , sequences and procedures , and for coordinating all portions of the Work <br /> under this Paft-2 Agreement . <br /> § 3 .2 . 7 The Design/Builder shall keepthe Owner informed of the progress and quality of <br /> P 9 q tY <br /> the Work . <br /> § 3 . 2 . 8 The Design/Builder shall be responsible for correcting Work which does not <br /> conform to the Contract Documents . <br /> § 3 . 2 . 9 The Design/Builder warrants to the Owner that materials and equipment <br /> furnished under the Contract will be of good quality and new unless otherwise required <br /> or permitted by the Contract Documents , that the construction will be free from faults <br /> and defects , and that the construction will conform with the requirements of the Contract <br /> Documents . Construction not conforming to these requirements , including substitutions <br /> not properly approved by the Owner, shall be corrected in accordance with Article 9 . <br /> § 3 . 2 . 10 The Design/Builder shall pay all sales , consumer, use and similar taxes which <br /> had been legally enacted at the time the Design/Builder's Proposal was first submitted <br /> to the Owner , and shall secure and pay for building and other permits and governmental <br /> fees , licenses and inspections necessary for the proper execution and completion of the <br /> Work which are either customarily secured after execution of a contract for construction <br /> or are legally required at the time the Design/Builder's Proposal was first submitted to <br /> the Owner. <br /> § 3 .2 . 11 The Design/Builder shall comply with and give notices required by laws , <br /> ordinances , rules , regulations and lawful orders of public authorities relating to the <br /> Project. <br /> § 3 .2 . 12 The Design/Builder shall pay royalties and license fees for patented designs , <br /> processes or products . The Design/Builder shall defend suits or claims for infringement <br /> of patent rights and shall hold the Owner harmless from loss on account thereof, but <br /> shall not be responsible for such defense or loss when a particular design , process or <br /> product of a particular manufacturer is required by the Owner. However, if the <br /> Design/Builder has reason to believe the use of a required design , process or product is <br /> an infringement of a patent, the Design/Builder shall be responsible for such loss unless <br /> such information is promptly furnished to the Owner. <br /> § 3 . 2 . 13 The Design/Builder shall keep the premises and surrounding area free from <br /> accumulation of waste materials or rubbish caused by operations under this PaFt-2 <br /> Agreement. At the completion of the Work , the Design/Builder shall remove from the <br /> site waste materials , rubbish , the Design/Builder's tools , construction equipment , <br /> machinery, and surplus materials . <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.