My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-026
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 1:23:53 PM
Creation date
10/1/2015 5:07:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/05/2013
Control Number
2013-026
Agenda Item Number
15.A.2
Entity Name
Barth Construction
Subject
Fire Station No.13 Phase III Expansion
Area
Fire Station No.13
Supplemental fields
SmeadsoftID
11725
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3 .2 . 14 The Design/Builder shall notify the Owner when the Design/Builder believes <br /> that the Work or an agreed upon portion thereof is substantially completed . If the <br /> Owner concurs , the Design/Builder shall issue a Certificate of Substantial Completion <br /> which shall establish the Date of Substantial Completion , shall state the responsibility of <br /> each party for security , maintenance , heat, utilities , damage to the Work and insurance , <br /> shall include a list of items to be completed or corrected and shall fix the time within <br /> which the Design/Builder shall complete items listed therein . Disputes between the <br /> Owner and Design/Builder regarding the Certificate of Substantial Completion shall be <br /> resolved in accordance with provisions of Article 10 . <br /> § 3 .2 . 15 The Design/Builder shall maintain at the site for the Owner one record copy of <br /> the drawings , specifications , product data , samples , shop drawings , Change Orders and <br /> other modifications , in good order and regularly updated to record the completed <br /> construction . These shall be delivered to the Owner upon completion of construction <br /> and prior to final payment. <br /> § 3 . 3 ADDITIONAL SERVICES <br /> § 3 .3 . 1 The services described in this Section 3 . 3 are not included in Basic Services <br /> unless so identified in Article 14 , and they shall be paid for by the Owner as provided in <br /> this PaFt 2 Agreement, in addition to the compensation for Basic Services . The services <br /> described in this Section 3 . 3 shall be provided only if authorized or confirmed in writing <br /> by the Owner. <br /> § 3 .3 . 2 Making revisions in drawings , specifications , and other documents or electronic <br /> data when such revisions are required by the enactment or revision of codes , laws or <br /> regulations subsequent to the preparation of such documents or electronic data . <br /> § 3 .3 . 3 Providing consultation concerning replacement of Work damaged by fire or other <br /> cause during construction , and furnishing services required in connection with the <br /> replacement of such Work . <br /> § 3 .3 .4 Providing services in connection with a heafing, arbitration proceeding or <br /> legal proceeding , except where the Design/Builder is a party thereto . <br /> § 3 .3 .5 Providing coordination of construction performed by the Owner's own forces or <br /> separate contractors employed by the Owner, and coordination of services required in <br /> connection with construction performed and equipment supplied by the Owner. <br /> § 3 .3 .6 Preparing a set of reproducible record documents or electronic data showing <br /> significant changes in the Work made during construction . <br /> § 3 .3 . 7 Providing assistance in the utilization of equipment or systems such as <br /> preparation of operation and maintenance manuals , training personnel for operation and <br /> maintenance , and consultation during operation . <br /> ARTICLE 4 TIME <br /> § 4. 1 Unless otherwise indicated , the Owner and the Design/Builder shall perform their <br /> respective obligations as expeditiously as is consistent with reasonable skill and care <br /> and the orderly progress of the Project. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.