Laserfiche WebLink
12 <br /> ANSWER NO . 35 <br /> There will be no change to the specifications . <br /> QUESTION NO. 36 <br /> The pile height should be a minimum 2 . 25" with infill height at a minimum of 1 . 75", namely <br /> since American football will be played . There should be a minimum 3 lbs . of sand and 3 lbs . of <br /> rubber per square foot in the infill . This should be expressly addressed . . <br /> ANSWER NO. 36 <br /> The pile height will remain 2" and infill to 1 W . Also the infill requirement will not change <br /> from current specifications . <br /> QUESTION NO* 37 <br /> Further clarification is required around the GMAX requirements and testing / performance . <br /> 125 G is exceptionally soft . Fieldturfs recommendation is that the field should be tested at <br /> the conclusion of the installation and the GMAX rating average of the field should not exceed <br /> 150 G . Proper maintenance performed by the county through the use of a Fieldturf <br /> GroomRight machine (included in our bid ) should keep these levels at or below the GMAX <br /> rating average of the field at 150 G . <br /> ANSWER NO . 37 <br /> GMAX rating will remain =< 140 at installation and remain =< 170 over the life of the warranty. <br /> QUESTION NO. 38 <br /> What about the use of a piggy- backed public cooperative purchasing system , TCPN which <br /> could be used to pull the turf from the general contract . It' s been used with three city <br /> governments here in Florida and TCPN was recently featured in an article in the Wall St . <br /> Journal . <br /> ANSWER NO. 38 <br /> This is an option that the County can pursue if desired . <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes 1I - <br /> 0542.doc <br />