My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> ANSWER NO. 31 <br /> Prefabricated buildings ( restroom/concession building and small bathrooms and the storage , <br /> building) will be added as an alternate bid . The prefabricated building must comply with all <br /> requirements shown in the Contract Documents . (Will be reflected in Addendum No . 2 — <br /> Itemized Bid Schedule ) <br /> QUESTION NO . 32 <br /> Section 3 . 4 B — the turf and stone system asks for 8" of stone . The industry-standard <br /> requirement is 6" of stone . The survey and soil samples will determine our engineering and <br /> design to make our final calculations on the drainage design within this stone base . <br /> ANSWER NO. 32 <br /> The Specification will be changed to "minimum 6"" . Will be reflected in Addendum No . 2 — <br /> Technical Specifications ) <br /> QUESTION NO . 33 <br /> What type of turf fiber? Slit4ilm or monofilament ? it would appear- that the county doesn't <br /> have a preference . Because of the nature of the use of the facility, Fieldturf _recommends the <br /> more durable slitAlm . <br /> ANSWER NO. 33 <br /> The County will accept both slit-film and monofilament . <br /> QUESTION NO * 34 <br /> Perforated , punched - hole backings, while not ideal, are adequate for this installation . There <br /> would be an up-charge for the superior SureLock coating system . <br /> ANSWER NO. 34 <br /> The County would entertain a better system , but not at a higher cost . <br /> QUESTION NO . 35 <br /> Turf manufacturers, as opposed to the yarn / fiber manufacturers should be named in the <br /> specs . The named yarn manufacturers will have nothing to do with the contracting of the full <br /> scope of work. Fieldturf is. fully vertically integrated as a yarn manufacturer, turf <br /> manufacturer, coater of the turf backing, contractor and installer. The site / stone / base <br /> would be the only scope of work subcontracted with Fieldturf. <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes I I - <br /> 0542 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.