My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> ANSWER NO, 28 <br /> The existing FM at the tie- in location is 4" PVC. Connections shall conform to IRCDUS <br /> standards . The tie- in will performed with a 4" x 4" tapping sleeve and a 4" to 2" reducer. The <br /> crossing of 20th Avenue will be performed by a directional bore . <br /> QUESTION NO. 29 <br /> Sheet G7 shows 8" sanitary running north from manhole 1A and tying into an existing <br /> manhole . Please provide the invert elevation . <br /> ANSWER NO. 29 <br /> Shown on Sheet G7 and the elevation a Manhole 1A for the 8" run to the existing MH at the <br /> existing bathroom facility is 12 . 44. <br /> QUESTION NO . 29 <br /> Please provide list of subcontractors not acceptable to IRC. If no list is provided please remove <br /> verbiage in the contract documents regarding changing unacceptable subcontractors at no <br /> additional cost . <br /> ANSWER NO . 29 <br /> No list will be provided . We also will not remove the language in the specifications about <br /> unacceptable subcontractors. However, we will look at subcontractors experience at <br /> performing a particular task . ( ie curb installation ) If they have never performed this work will <br /> probably will not allow them to do this work on this project. <br /> QUESTION NO. 30 <br /> Please provide the schedule backup for the 180 day substantial and 210 final completion <br /> dates, which liquidated damages are to be based . <br /> ANSWER NO. 30 <br /> The 180 days to Substantial Completion and 210 days to Final Completion was arrived at by <br /> having the fields ready for play in September, 2013 with an estimated construction start date <br /> toward the end of January/early February 2013 . <br /> QUESTION NO. 31 <br /> Can prefabricated restroom building be added as an equal to the two site built buildings ? <br /> F:\Public Works\ENG IN EE RING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes 11 - <br /> 0542 .doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.