Laserfiche WebLink
9 <br /> ANSWER NO. 24 <br /> They will be hardwired, not wireless, and controlled at the concession/restroom building. <br /> QUESTION NO. 25 <br /> Sheet C-3, notes on right edge of sheet — grass type is conflicting. Sheet C-3 States "ALL <br /> FIELD GRASS TO BE CELEBRATION HYBRID BERMUDA GRASS" . And note 8 states "ALL FIELD <br /> GRASS SHALL BE 419 HYBRID" . Further conflict exists on the Itemized Bid Schedule Item 31 <br /> calls for 419 Bermuda . Please confirm the type of grass to be used on the Fields. <br /> ANSWER NO . 25 <br /> 419 Hybrid Bermuda Big Roll sod shall be used . (Will be reflected in Addendum No . 2 — <br /> Itemized Bid Schedule ) <br /> QUESTION NO. 26 <br /> Please confirm that Item 47 of the Itemized Bid Schedule is not to include the cost related to <br /> the grass/turf of the Multi- Purpose Fields . Do we assume that grass/sod cost shall be itemized <br /> in Line 31 of the Itemized Bid Schedule . <br /> ANSWER NO . 26 <br /> As mentioned previously, sod cost for the fields shall be a separate line item and will be Item <br /> #31 . <br /> QUESTION NO. 27 <br /> Sheet C- 12 shows the sanitary sewer piping as Ductile Iron (8" DI ) the Itemized Bid Schedule <br /> item 55-56 calls for PVC. Please confirm the piping type for the sanitary sewer. <br /> ANSWER NO . 27 <br /> Sanitary Sewer piping shall be PVC. <br /> QUESTION NO. 28 <br /> Sheet C-7 shows the 2" FM tying into an existing line "Contractor to field locate sewer line at <br /> tie- in location" Please provide the size and type of line we are schedule to tie into and provide <br /> connection details for connection . <br /> FAPublic Works\ENGINEERING DIVISION PROJECTSA 126 - South Co Park Multi Purpose Fields\Admirn\Meetings\Pre-bid Meeting Minutes 1I - <br /> 05- 12. doc <br />