Laserfiche WebLink
8 <br /> ANSWER NO. 20 <br /> The old fence material shall become the property of the contractor and he shall dispose of the <br /> material properly. <br /> QUESTION NO. 21 <br /> If the fence is considered waste than would the following note apply? Sheet C-3, Note 7. "Solid <br /> waste disposal will be performed by Waste Management" Is the Owner paying for the debris <br /> removal on this project ? <br /> ANSWER NO. 21 <br /> Contractor is responsible to pay costs for debris removal . <br /> QUESTION NO. 22a and b <br /> The itemized bid schedule ( items 20-29 ) shows that all material is to be Black Vinyl Coated . <br /> a . The existing Baseball fields are currently Green Vinyl Coated . Do we assume <br /> the fabric going back up at baseball fields is to be green to match . <br /> b . Please confirm that the baseball fields and soccer field are going to be <br /> different colors. <br /> ANSWER NO. 22a <br /> The color will be black. <br /> ANSWER NO . 22b <br /> All fabric for fencing will be black. <br /> QUESTION NO. 23 <br /> Please confirm the location of the (4) Scoreboards so we can determine the cost for the <br /> electrical component to this item . <br /> ANSWER NO . 23 <br /> Scoreboards shall be placed approximately 25' south and 50' east of the S. E . corner of each <br /> field . <br /> QUESTION NO. 24 <br /> How will scoreboard be controlled ? Wireless? <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes 11 - <br /> 0542 . doc <br />