Laserfiche WebLink
7 <br /> ANSWER N0 . 16 <br /> Fence post spacing shall be 10' O. C. to match existing fences on site . (Will be reflected in <br /> Addendum No . 2 - Technical Specifications ) <br /> QUESTION NO. 17 <br /> There is no mention of replacing the fabric on the gates of the baseball fields. Should this be <br /> added to the scope ? <br /> ANSWER NO . 17 <br /> YES . Fabric on gates shall be provided . (Will be reflected in Addendum No . 2 - Technical <br /> Specifications) <br /> QUESTION NO. 18 <br /> The dugouts on baseball Fields 1 & 2 have no bottom rail on the front edge facing the field of <br /> play. The other 2 baseball fields ( 3 &4) have this . Should this be added to the scope ? <br /> ANSWER N0 . 18 <br /> Yes . Bottom rail should be added and included in the cost of the fabric replacement . (Will be <br /> reflected in Addendum No . 2 - Technical Specifications) <br /> QUESTION NO. 19 <br /> The 10' tall sections that are adjacent to the dugouts in the baseball fields only have bottom <br /> rail up to the edge of the concrete . Should this bottom rail be extended to the end of the 10' <br /> tall fence section ? <br /> ANSWER NO . 19 <br /> Yes . Bottom rail should be added and included in the cost of the fabric replacement. (Will be <br /> reflected in Addendum No . 2 - Technical Specifications ) <br /> QUESTION NO. 20 <br /> In regards to disposal of materials, in this case fence fabric from the baseball fields, <br /> referencing Section 01009 of the Special Provisions, 1 . 1 General, Note C. . The old fence . <br /> material has value as a recyclable material . It would benefit the County to take possession . It <br /> would be most efficient, and have least environmental impact, to transport this material <br /> directly to a recycling facility. Please verify that the fencing contractor is not responsible for <br /> transport, and should leave the material on site in a designated area . <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes 11 - <br /> 0542.doc <br />