My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> ANSWER N0 . 16 <br /> Fence post spacing shall be 10' O. C. to match existing fences on site . (Will be reflected in <br /> Addendum No . 2 - Technical Specifications ) <br /> QUESTION NO. 17 <br /> There is no mention of replacing the fabric on the gates of the baseball fields. Should this be <br /> added to the scope ? <br /> ANSWER NO . 17 <br /> YES . Fabric on gates shall be provided . (Will be reflected in Addendum No . 2 - Technical <br /> Specifications) <br /> QUESTION NO. 18 <br /> The dugouts on baseball Fields 1 & 2 have no bottom rail on the front edge facing the field of <br /> play. The other 2 baseball fields ( 3 &4) have this . Should this be added to the scope ? <br /> ANSWER N0 . 18 <br /> Yes . Bottom rail should be added and included in the cost of the fabric replacement . (Will be <br /> reflected in Addendum No . 2 - Technical Specifications) <br /> QUESTION NO. 19 <br /> The 10' tall sections that are adjacent to the dugouts in the baseball fields only have bottom <br /> rail up to the edge of the concrete . Should this bottom rail be extended to the end of the 10' <br /> tall fence section ? <br /> ANSWER NO . 19 <br /> Yes . Bottom rail should be added and included in the cost of the fabric replacement. (Will be <br /> reflected in Addendum No . 2 - Technical Specifications ) <br /> QUESTION NO. 20 <br /> In regards to disposal of materials, in this case fence fabric from the baseball fields, <br /> referencing Section 01009 of the Special Provisions, 1 . 1 General, Note C. . The old fence . <br /> material has value as a recyclable material . It would benefit the County to take possession . It <br /> would be most efficient, and have least environmental impact, to transport this material <br /> directly to a recycling facility. Please verify that the fencing contractor is not responsible for <br /> transport, and should leave the material on site in a designated area . <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes 11 - <br /> 0542.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.