Laserfiche WebLink
14 <br /> ANSWER NO. 43 <br /> The northern portion of the park will remain open — playground area and baseball fields . <br /> Areas of existing parking will need to be kept open during construction . A sketch/map will be <br /> provided for the areas of parking to be left open . <br /> QUESTION NO . 44 <br /> With regard to the Lift Station — is it a cold powder epoxy coating on it or is it fiberglass lining? <br /> ANSWER NO . 44 <br /> Per Mike Hotchkiss, IRCDUS, typically concrete — no liner. <br /> QUESTION NO. 45 <br /> Does the typical detail show a generator on the lift station ? <br /> ANSWER NO . 45 <br /> No . <br /> QUESTION NO. 146 <br /> Note . 3 on Sheet C1 states prepare some temporary parking and storage — where are these . <br /> areas to be located ? <br /> ANSWER NO. 46 <br /> In the area on the north section of the drive where the two proposed parking bays to be . <br /> constructed . <br /> QUESTION NO. 47 <br /> Are there any special requirements for fill dirt/any gradation requirements ? <br /> ANSWER NO. 47 <br /> All fill dirt shall meet AASHTO Soil Classification A=3 with a maximum of 10% passing the 0.075 <br /> ( 200) sieve . <br /> QUESTION NO. 48 <br /> Are old septic tanks being imploded behind existing restroom area ? <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ I 126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes 11 - <br /> 05- I2. doc <br />