My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> ANSWER NO . %48 <br /> Abandon drain field and old septic tanks — fill with sand — all of this work is done through IRC <br /> Environmental Health . <br /> QUESTION NO . 49 <br /> Do the County lift stations have an RTU ? <br /> ANSWER NO, 49 <br /> Yes . <br /> QUESTION NO. 50 <br /> The plans show some 12" PVC pipe listed for drainage — cross drains . Is this ADS ? Or HDPE ? <br /> ANSWER NO. 50 <br /> We changed it all in the Specifications and show it as Corrugated Aluminum , <br /> QUESTION NO, 51 <br /> Is there a DEP permit for the water line ? There is one sample pointing on the water and then <br /> one in the middle of the road . <br /> ANSWER NO. 51 <br /> Kimley- Horn Associates, Inc. as EOR has applied for the permit . If the permit has been issued <br /> prior to Addendum No . 3, a copy will be supplied . If not, we will try to direct you on how to <br /> bid . <br /> QUESTION NO. 52 <br /> Are the 6" water mains correct going up to all buildings ? There are no backflows shown on <br /> plans — is this correct ? <br /> ANSWER NO . 52 <br /> We will reduce 6" water mains to 2" water mains in some places . Detail sketch is attached . No <br /> backflow preventer is required at restrooms for service. <br /> QUESTION NO. 53 <br /> For the lift station — what are the motor sizes and what is the voltage expected ? <br /> F:\Public Works\ENGMEERING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\Meetings\Pre-bid Meeting Minutes I I . <br /> 05- 12. doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.