My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS / CORRECTIONS/QUESTIONS AND RESPONSES <br /> The following questions (with responses ) were received after the Mandatory Pre- Bid Meeting on <br /> November 5, 2012 : <br /> QUESTION NO* I <br /> Can more information be provided on the grow in period and procedure for Bid Alternate A2 <br /> Sprigging ? <br /> ANSWER N0. 1 <br /> Additional information has been provided in the Technical Specifications . <br /> QUESTION NO. 2 <br /> Is bottom rail to be included on 10' high, fence, dug-outs and backstops if needed ? <br /> ANSWER NO. 2 <br /> Yes , <br /> QUESTION NO. 3 <br /> " Replacing or straightening rails, braces fittings as needed" can be determined with a site visit. If re- <br /> painting any of the existing components is required . How do we determine how extensively? Should <br /> painting be left out of scope ? <br /> ANSWER NO. 3 <br /> Leave painting out of scope . <br /> QUESTION NO. 4 <br /> The specs and notes in RFQ conflict to an extreme level . The RFQ notes call for the existing posts to <br /> be extended to 20' high . None of the posts currently set will meet required wind load requirements <br /> for standard Design practices, and permitting designs generally required . <br /> ANSWER NO. 4 <br /> Modifications to the backstops will only include replacement of fabric, addition of bottom rail where <br /> needed , and adjust bracing, rails and posts as needed . <br /> Page 2 of 6 <br /> FAPublic Works\ENG IN E E RING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\bid documents\Addendum No. 2 11442 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.