Laserfiche WebLink
CLARIFICATIONS / CORRECTIONS/QUESTIONS AND RESPONSES <br /> The following questions (with responses ) were received after the Mandatory Pre- Bid Meeting on <br /> November 5, 2012 : <br /> QUESTION NO* I <br /> Can more information be provided on the grow in period and procedure for Bid Alternate A2 <br /> Sprigging ? <br /> ANSWER N0. 1 <br /> Additional information has been provided in the Technical Specifications . <br /> QUESTION NO. 2 <br /> Is bottom rail to be included on 10' high, fence, dug-outs and backstops if needed ? <br /> ANSWER NO. 2 <br /> Yes , <br /> QUESTION NO. 3 <br /> " Replacing or straightening rails, braces fittings as needed" can be determined with a site visit. If re- <br /> painting any of the existing components is required . How do we determine how extensively? Should <br /> painting be left out of scope ? <br /> ANSWER NO. 3 <br /> Leave painting out of scope . <br /> QUESTION NO. 4 <br /> The specs and notes in RFQ conflict to an extreme level . The RFQ notes call for the existing posts to <br /> be extended to 20' high . None of the posts currently set will meet required wind load requirements <br /> for standard Design practices, and permitting designs generally required . <br /> ANSWER NO. 4 <br /> Modifications to the backstops will only include replacement of fabric, addition of bottom rail where <br /> needed , and adjust bracing, rails and posts as needed . <br /> Page 2 of 6 <br /> FAPublic Works\ENG IN E E RING DIVISION PROJECTS\ 1126 - South Co Park Multi Purpose Fields\Admim\bid documents\Addendum No. 2 11442 .doc <br />