Laserfiche WebLink
3) Baseball field dugouts : Remove existing fabric from all eight (8 ) dugouts . Install new <br /> fabric 10 ' high cut down to fit front and sides . Install 7 ' high on backs . <br /> 4) Baseball field Backstops : Fields 1 &2 have (4) 3 " posts and (4) 2- 1 /2 " posts each . <br /> Fields 3&4 have (8) 4" posts each . Install new fabric two rows of 10 ' high to total 20 ' <br /> high . <br /> 5) Bottom rail must be added to front edging of fence at the dugouts and to the 10' high <br /> fence where bottom rail is missing . Cost to be included in price of fence . <br /> 6) All chain link fence shall conform to the following : <br /> Fabric : 72 " 9 GA . , 1 . 2 oz . galvanized (2 " mesh ) Chain Link Fabric . . (6 GA . w/ vinyl coating ) <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 20 — Fencing Type B ( Black Vinyl Coated) 6 ' HT — Per Linear Foot <br /> Bid Item No : 21 — Fence Gate ( 16 ' Double Swing ) ( Black Vinyl Coated ) — Per Each <br /> Bid Item No . 22 — Fence Gate ( 16 ' Sliding ) ( Black Vinyl Coated ) — Per Each <br /> Bid Item No . 23 — Fence Gate ( 12 ' Sliding) ( Black Vinyl Coated ) ommom Per Each <br /> Bid Item No . 20 — Fence Gate (8 ' Swing ) ( Black Vinyl Coated) — Per Each <br /> Bid Item No . 24 — Fence Gate (6 ' Sliding ) ( Black Vinyl Coated ) — Per Each <br /> Bid Item No . 26 through 29 - Baseball Field (4) Fencing ( Black Vinyl Coated ) <br /> (See Spec . Above) — Per Linear Foot <br /> SECTION - 26 — PERFORMANCE TURF <br /> The work specified in this item shall conform to Section 570 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010) . <br /> A. Description : Sod for the project shall be of the variety that is common to the area <br /> and of a variety approved by the Engineer. This work shall also include mowing in <br /> accordance with Section 104-7 . 2 , to be mowed at 6 " height with a mulching mower. <br /> B . Work Included : Scope of Work % The work specified in this section consists of the <br /> establishing of a stand of grass , within the project limits to 10' beyond proposed fence , <br /> and other areas indicated on the Drawings , by furnishing and placing grass sod . Also <br /> included are fertilizing , watering and maintenance as required to assure a healthy <br /> stand of grass . Two applications of fertilizer will be required with the initial application <br /> being fertilizer and the second application being "weed and feed " . <br /> C . Guarantee : All sodded areas shall be guaranteed for three months after date of final <br /> acceptance . <br /> Replacement of Defective Sod : Any dead sod or sod showing ( less than 95 % of a <br /> square) indication of probable non survival or lack of health and vigor, or which do not <br /> exhibit the characteristics to meet specifications , shall be replaced within two weeks of <br /> notice from Owner or Engineer. All replacement sod shall be furnished/installed at no <br /> additional cost to the Owner and shall be guaranteed for three months . All replacement <br /> shall meet original specifications . <br /> The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br /> guarantee period and such guarantee shall be extended until notification is received . <br /> At the end of the guarantee period , all sod that is dead or in unsatisfactory growth shall <br /> Addendum #2 11 /8/2012 01025-24 1Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1126 - South Co Park Multi Purpose Fields\Admim\bid documents\Contract <br /> Documents\Technical Specifications ADD #2 .doc <br />