My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be replaced within two weeks . <br /> D . Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws . <br /> The numerical designations . for fertilizer indicate the minimum percentages <br /> ( respectively) of ( 1 ) total nitrogen , (2) available phosphoric acid and (3 ) water-soluble <br /> potash contained in the fertilizer. <br /> The chemical designation of the fertilizer shall be 16 -0-8 . Fertilizer shall include iron , <br /> minor nutrients and trace elements . At least 50 percent of the nitrogen shall be derived <br /> from organic sources . <br /> Contractor shall ensure 1 pound , of nitrogen per 1 , 000 square feet . <br /> E . Water for Grassing : Contractor shall provide the water used in the sodding <br /> operations as necessary to meet the requirements of Article 570-5 and 2 :34 . 13 . <br /> F . Preparation of Ground : The area over which the sod is to be placed shall be . <br /> scarified or loosened to a depth and then raked smooth and free from debris . Where <br /> the soil is sufficiently loose and clean , the Owner, at his discretion , may authorize the <br /> elimination of ground preparation . <br /> G . Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br /> range of 6 . 0 - 7 . 0 . <br /> Contractor shall apply two (2) applications . The initial shall be fertilizer and the second <br /> application shall be "weed and feed " . <br /> The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br /> per acre , or 10 pounds per 1 , 000 square feet, by a spreading device capable of <br /> uniformly distributing the material at the specified rate . <br /> Contractor shall apply applications as per manufacturer's specification . All tickets from <br /> bags shall be handed over to the County Inspector. <br /> On steep slopes , where the use of a machine for spreading or mixing is not <br /> practicable , the fertilizer shall be spread by hand and raked in and thoroughly mixed <br /> with the soil to a depth of approximately 2 inches . <br /> H . Placing Sod : The sod shall be placed on the prepared surface , with edges in close <br /> contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools . <br /> Where sodding is used in drainage ditches , the setting of the pieces shall be staggered <br /> so as to avoid a continuous seam along, the line of flow. Along the edges of such <br /> staggered areas , the offsets of individual strips shall not exceed 16 inches . In order to <br /> prevent erosion caused by vertical edges at the outer limits , the outer pieces of sod . <br /> shall be tamped. so as to produce a featheredge effect. <br /> On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth , at suitable intervals . <br /> Sodding shall not be performed when weather and soil conditions are , in the <br /> Engineer' s opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc. <br /> I . Sod placed on Ballfields (419 Hybrid Bermuda ) will be with big roll sod , with seams cut <br /> to match adjacent sod . <br /> J . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , <br /> as determined by the Engineer, for optimum results . After being placed , the sod shall <br /> Addendum #2 11 /8/2012 01025-25 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\11267 South Co Park Multi Purpose Fields\Admim\bid documents\Contract <br /> Documents\Technical Specifications ADD #2 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.